My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F WINZLER _KEL.LY RECESVED , <br /> O N S U L T I h G f N G I N'E E R -S ��1VIs..Margaret Lagorio, RENS. _ UUyll1rr <br /> Janu 16 2004 <br /> . - �' ,. FEB 0 9 2004, <br /> Page 4 ^°ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> • Introduction and scope of work; S T <br /> • Maps identifying boring and well locations; - - <br /> • Boring/monitoring well log;' ' . - <br /> •. . Sampling results, including sampling- assessment, and analytical methods; k <br /> Findings; <br /> • Laboratory reports with chain=of-custody'documentation;[and <br /> • Conclusions and recommendations for subsequent investigations, if required. <br /> The report will be preparedrwithin 45 days following receipt of.analytical results. <br /> Task 6—Semi-Annual Groundwater Sampling Reports <br /> After receipt of all the laboratory.data,Winzler.&-Kelly will prepare a report todocumentthe . <br /> findings. The.Semi-Annual•Groundwater Sampling Report-will include the following: <br /> Introduction and scope of work;-'. <br /> • Maps identifying boring and well.locations; <br /> • Tables summarizing sampling results to.,date, groundwater" gradient, and indicator• _ <br /> parameters; <br /> -. Groundwater gradient and contour maps; <br /> Findings; 4 . <br /> Laboratory reportswith chain-of-custody documentation;Rand <br /> • Conclusions and recommendations for subsequentsampling events, if required: <br /> Y <br /> The report will be prepared within 45 days following`receipt of analytical,results. - <br /> f Anticipated Schedule <br /> January 2004, Submit Workplan--=: f <br /> February 2004_. Receive Workplan Approval from EHDSJE . <br /> April 2004 Investigation Drilling and Groundwater.Sampling <br /> June 2004 Submit Report.of Findings <br /> r a� <br /> Oc#obe2004 . Semi-Annual Groundwater Sampling Event~ - <br /> 1 November 2004 Submit Semi-Arinual Groundwater.Sampling Report <br /> April 2005 Semi Annual Groundwater Sampling Event' <br /> May.2005 Submit Semi-Annual Groundwater Sampling Report <br /> October 2005 Semi-Annual Groundwater.Sampling Event <br /> November.2005 - Submit Semi-Annual Groundwater-Sampling Report <br /> _ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.