Laserfiche WebLink
R � <br /> i <br /> Subsurface Investigation Workplan <br /> CHP Facility, 385 West Grantline, Tracy <br /> February 19 1999 <br /> f • 5 oxygenates using EPA Method 8260. <br /> All laboratory analyses will be performed by a state-certified Iaboratory. Chain of Custody <br /> protocol will be followed for all samples selected for;analysis, thus providing a continuous record <br /> of sample possession prior to actual analysis. <br /> 3.3 SUBSURFACE INVESTIGATION REPORT <br /> A report will be submitted on the subsurface investigation results and will include boring logs, <br /> laboratory analysis results, findings, and conclusions. <br /> 4.0 WORK SCHEDULE <br /> Planned activities will be performed according to the following estimated completion schedule: <br /> • Drill borings approximately' two weeks after w;or 1' approval. <br /> ? <br /> g kP , PP I <br /> • Submit subsurface investigation report approximately five weeks after completion of field <br /> I; <br /> activities. <br /> f <br /> E <br /> 5.0 LIST OF ATTACHMENTS i <br /> I; <br /> • Figure 1: Site Vicinity Map ' <br /> i <br /> • Figure 2: Site Plan <br /> • Appendix A: General Field Procedures <br /> j <br /> I � L <br /> 1 I <br /> I <br /> } <br /> a <br />