My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
385
>
2900 - Site Mitigation Program
>
PR0508441
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 1:14:17 PM
Creation date
1/22/2020 1:02:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508441
PE
2950
FACILITY_ID
FA0008077
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #266
STREET_NUMBER
385
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21449012
CURRENT_STATUS
01
SITE_LOCATION
385 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R � <br /> i <br /> Subsurface Investigation Workplan <br /> CHP Facility, 385 West Grantline, Tracy <br /> February 19 1999 <br /> f • 5 oxygenates using EPA Method 8260. <br /> All laboratory analyses will be performed by a state-certified Iaboratory. Chain of Custody <br /> protocol will be followed for all samples selected for;analysis, thus providing a continuous record <br /> of sample possession prior to actual analysis. <br /> 3.3 SUBSURFACE INVESTIGATION REPORT <br /> A report will be submitted on the subsurface investigation results and will include boring logs, <br /> laboratory analysis results, findings, and conclusions. <br /> 4.0 WORK SCHEDULE <br /> Planned activities will be performed according to the following estimated completion schedule: <br /> • Drill borings approximately' two weeks after w;or 1' approval. <br /> ? <br /> g kP , PP I <br /> • Submit subsurface investigation report approximately five weeks after completion of field <br /> I; <br /> activities. <br /> f <br /> E <br /> 5.0 LIST OF ATTACHMENTS i <br /> I; <br /> • Figure 1: Site Vicinity Map ' <br /> i <br /> • Figure 2: Site Plan <br /> • Appendix A: General Field Procedures <br /> j <br /> I � L <br /> 1 I <br /> I <br /> } <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.