Laserfiche WebLink
�•� <br /> SHARP Mana ementMatual <br /> `" e) 'M <br /> t <br /> Former Tracy MGP Project Safety Plan PSPJ <br /> • Only qualified operators will be allowed to operate heavy equipment,per safe work guidelines included in the OSHA <br /> General Industry(29 CFR 1910)and Construction Industry(29 CFR 1926)standards. <br /> • Site work should be performed during daylight hours whenever possible. Work conducted during hours of darkness <br /> requires enough illumination intensity to read a newspaper without difficulty. Working at night requires prior notification <br /> of the Facility Health and Safety Representative. <br /> • Common paths of travel should be established and kept free from the accumulation of materials. <br /> Slip,Trips,Falls <br /> • Provide slip-resistant surfaces,ropes,and/or other devices to be used. <br /> • Specific areas should be designated for the proper storage of materials.Tools,equipment,materials,and supplies will be <br /> stored in an orderly manner. <br /> • As work progresses,scrap and unessential materials must be neatly stored or removed from the work area. Containers for • <br /> trash and other debris will be provided and will be removed at regular intervals. <br /> • All spills will be quickly cleaned up. Oil and grease will be cleaned from walking and working surfaces. <br /> Training Requirements: <br /> All personnel engaged in hazardous substance removal or other activities that expose or potentially expose them to hazardous <br /> substances or health hazards shall receive appropriate training as required by 29 CFR 1910.120(e), including, but not limited to, <br /> initial 40-hour, 8-hour Supervisor and annual 8-hour refresher training. <br /> • <br /> A-12 <br />