My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
gyve o <br /> SHARP Afanageaneat Manual <br /> w�q•o�'• Former Tracy MGP Project Safety Plan(PSP) <br /> Site-Specific Proiect Safety Plan Orientation <br /> Project Name: Former Tracy MGP Project Location: Tracy, CA <br /> Names of personnel responsible for site safety and health <br /> Project Manager: Tom Blaney(626)440-6067; (626) 533-3740 <br /> Field Team Manager/ Safety Representative: Travis Hinman(925) 941-3708; (510) 295-3392 <br /> • Emergencies - Call 911 and/or your Supervisor for emergencies. In the event of an evacuation, the <br /> assembly point is the access gate to the site. <br /> • Incidents — report all incidents (any unplanned or unexpected event that results in personal injury, <br /> property damage or environmental release) and"near-miss incidents" to your Supervisor and the Site <br /> HSO. Near incidents COULD HAVE been an incident, but didn't because of a slight change in <br /> conditions or luck. However, they have the same causal factors as an incident, so it is just important <br /> to investigate them for identifying solutions to prevent recurrence and share lessons teamed. <br /> • Communications — the response for anyone from the general public (e.g. media, workers from <br /> adjacent properties, etc.) inquiring about the project is: "I'm song, but I'm not the right person to <br /> answer your question. If you contact the project manager Tom Blaney he will be able to help you". <br /> Safety,health, and other hazards at the site <br /> • Exposure to contaminated soils and groundwater posses the greatest risk during site activity. Heavy <br /> equipment (Drill rig) will be in operation during the investigation and should never be approached <br /> unless signaled by the operator or the equipment is not running. <br /> • Exposure potential is minimal but possible during soil and groundwater investigations. Multi-gas <br /> meters will be used to monitor the air five to six feet from the ground to simulate the workers <br /> breathing zone. If multi-gas meter readings are above 5 ppmv for 30 seconds in the breathing zone, <br /> then Draeger tube readings and Chromosorb 106 tubes will be taken to determine if the vapors are <br /> Benzo(a)pyrene (BAP) or Benzene. If benzene levels exceed 0.5 ppmv, then personnel will be <br /> required to wear respiratory protection. If VOC readings consistently exceed 25 ppmv, then work <br /> will be stopped until conditions can be brought back into compliance. A water truck will be present <br /> onsite at all times for dust suppression. <br /> Proper use of personal protective equipment <br /> • Minimum PPE - hard hat, safety glasses with side shields, steel toe work boots and long sleeve shirt. <br /> Tinted safety glasses are not permitted during overcast weather, after sundown or inside buildings. <br /> High visibility vest/coat (with reflective stripes if working after dusk) is required when regularly <br /> exposed to vehicular traffic. Any high visibility vest/coat other than a traditional traffic vest must be <br /> pre-approved by the Safety Manager. <br /> • Hearing protection—when working in close proximity with heavy equipment or you need to raise your <br /> voice when speaking to someone 3 feet away. <br /> Work practices by which the emplovee can minimize risk from hazards <br /> B-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.