My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Thereafter, the surface will be returned to conditions that existed prior to drilling <br /> operations. <br /> Based on the RI boring logs, it is anticipated that three geotechnical samples will be <br /> collected from each boring. Results of the geotechnical sampling and boring logs will be <br /> included in a geotechnical report for the Site. This work will be conducted by ERRG with <br /> oversight from Parsons. Results from the geotechnical report will be included in the <br /> project specifications such that the remediation contractor can design the appropriate <br /> shoring method for removal of impacts in AOI-3 and AOI-4. <br /> PROJECT SCHEDULE <br /> It is anticipated that the implementation of the field effort associated with this CWA <br /> estimate will be conducted in February 2011. <br /> PROJECT TEAM <br /> Mr. Paul Farmanian will provide overall PG&E Program Management services on an <br /> interim basis. Mr. Farmanian will make sure that work is conducted in accordance with <br /> PG&E requirements and the Master Services Agreement. Mr. Farmanian will also serve as <br /> the Parsons MGP Portfolio Manager. Mr. Vipul Srivastava will serve as the project's <br /> Technical Director. <br /> Mr. Tom Blaney will serve as the Project Manager and is responsible for the work quality, <br /> schedule and budget. Our Geotechnical consultant (ERRG) and our analytical laboratory <br /> (Calscience) are California Public Utility Commission (CPUC) diversity licensed <br /> contractors. Drilling services will be contracted through ERRG and will be provided by <br /> Greg Drilling. <br />
The URL can be used to link to this page
Your browser does not support the video tag.