Laserfiche WebLink
4 <br /> Thereafter, the surface will be returned to conditions that existed prior to drilling <br /> operations. <br /> Based on the RI boring logs, it is anticipated that three geotechnical samples will be <br /> collected from each boring. Results of the geotechnical sampling and boring logs will be <br /> included in a geotechnical report for the Site. This work will be conducted by ERRG with <br /> oversight from Parsons. Results from the geotechnical report will be included in the <br /> project specifications such that the remediation contractor can design the appropriate <br /> shoring method for removal of impacts in AOI-3 and AOI-4. <br /> PROJECT SCHEDULE <br /> It is anticipated that the implementation of the field effort associated with this CWA <br /> estimate will be conducted in February 2011. <br /> PROJECT TEAM <br /> Mr. Paul Farmanian will provide overall PG&E Program Management services on an <br /> interim basis. Mr. Farmanian will make sure that work is conducted in accordance with <br /> PG&E requirements and the Master Services Agreement. Mr. Farmanian will also serve as <br /> the Parsons MGP Portfolio Manager. Mr. Vipul Srivastava will serve as the project's <br /> Technical Director. <br /> Mr. Tom Blaney will serve as the Project Manager and is responsible for the work quality, <br /> schedule and budget. Our Geotechnical consultant (ERRG) and our analytical laboratory <br /> (Calscience) are California Public Utility Commission (CPUC) diversity licensed <br /> contractors. Drilling services will be contracted through ERRG and will be provided by <br /> Greg Drilling. <br />