i 3 <br /> +, g SHARP Management Manual <br /> Former Tracy MGP Project Safety Plan (PSP) <br /> 5.3 PRE-BID MEETING <br /> Pre-bid meetings are required to ensure that bidders understand the RFP, including expectations <br /> for safety and health performance. Subcontractors must complete a Parsons Safety Evaluation <br /> package as outlined in Section 5.6, prior to attending a pre-bid meeting. During the pre-bid <br /> meeting, the Project Manager uses the Pre-Field Work Safety Meeting Checklist (Exhibit 5-1) to <br /> review project safety philosophy, principles, and Parsons' requirements with all prospective <br /> bidders. Although this information is included in the RFP, the meeting reinforces the message. <br /> 5.4 CONTRACTOR SAFETY EVALUATION <br /> Project procurement procedures require that all contractors (and any lower tier subcontractor) <br /> submit prequalification documentation for evaluation. The Procurement Manager or Division <br /> Safety Manager conducts the safety evaluation in accordance with the Parsons Contractor Safety <br /> Evaluation process and package posted on Par Share. <br /> For this project, there will be subcontractors directly hired by Parsons; thus, Parsons Contractor <br /> Safety Evaluations will be required for this project. <br /> 5.5 PRE-FIELD WORK MEETING <br /> The Project Manager holds a pre-field work safety meeting before the subcontractor begins <br /> work. The meeting includes subcontractor representatives, contracts manager, and <br /> representatives from all disciplines, including safety. During the safety review, the meeting <br /> participants review specific safety site/area, pre-bid risk analysis, and competent person and site- <br /> specific safety plan requirements. In addition, the Project Manager obtains a safety point of <br /> contact and emergency management information. The attached Mobilization/Kickoff Safety <br /> Meeting (Exhibit 5-2) is used by the Project Manager to document the meeting. <br /> 5.6 COMPETENT PERSON SUBMISSION REVIEW <br /> Parsons and its subcontractors must identify OSHA-regulated and certified competent persons <br /> for work or tasks requiring that level of supervision. The Parsons' personnel listed below will be <br /> assigned to the project and have the designated certifications. <br /> Name Job 77t1e 40-hr 8-hr HAZWOPER 8-hr HAZWOPER CPR/First Aid <br /> HAZWOPER Supervisor refresher <br /> expires <br /> Travis Hinman Field Team Feb 2004 August 2006 Feb 2008 September2006 <br /> Leader <br /> 17 <br />