My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i 3 <br /> +, g SHARP Management Manual <br /> Former Tracy MGP Project Safety Plan (PSP) <br /> 5.3 PRE-BID MEETING <br /> Pre-bid meetings are required to ensure that bidders understand the RFP, including expectations <br /> for safety and health performance. Subcontractors must complete a Parsons Safety Evaluation <br /> package as outlined in Section 5.6, prior to attending a pre-bid meeting. During the pre-bid <br /> meeting, the Project Manager uses the Pre-Field Work Safety Meeting Checklist (Exhibit 5-1) to <br /> review project safety philosophy, principles, and Parsons' requirements with all prospective <br /> bidders. Although this information is included in the RFP, the meeting reinforces the message. <br /> 5.4 CONTRACTOR SAFETY EVALUATION <br /> Project procurement procedures require that all contractors (and any lower tier subcontractor) <br /> submit prequalification documentation for evaluation. The Procurement Manager or Division <br /> Safety Manager conducts the safety evaluation in accordance with the Parsons Contractor Safety <br /> Evaluation process and package posted on Par Share. <br /> For this project, there will be subcontractors directly hired by Parsons; thus, Parsons Contractor <br /> Safety Evaluations will be required for this project. <br /> 5.5 PRE-FIELD WORK MEETING <br /> The Project Manager holds a pre-field work safety meeting before the subcontractor begins <br /> work. The meeting includes subcontractor representatives, contracts manager, and <br /> representatives from all disciplines, including safety. During the safety review, the meeting <br /> participants review specific safety site/area, pre-bid risk analysis, and competent person and site- <br /> specific safety plan requirements. In addition, the Project Manager obtains a safety point of <br /> contact and emergency management information. The attached Mobilization/Kickoff Safety <br /> Meeting (Exhibit 5-2) is used by the Project Manager to document the meeting. <br /> 5.6 COMPETENT PERSON SUBMISSION REVIEW <br /> Parsons and its subcontractors must identify OSHA-regulated and certified competent persons <br /> for work or tasks requiring that level of supervision. The Parsons' personnel listed below will be <br /> assigned to the project and have the designated certifications. <br /> Name Job 77t1e 40-hr 8-hr HAZWOPER 8-hr HAZWOPER CPR/First Aid <br /> HAZWOPER Supervisor refresher <br /> expires <br /> Travis Hinman Field Team Feb 2004 August 2006 Feb 2008 September2006 <br /> Leader <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.