My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2900 - Site Mitigation Program
>
PR0528085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2020 3:32:20 PM
Creation date
1/22/2020 3:21:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528085
PE
2959
FACILITY_ID
FA0019016
FACILITY_NAME
PG&E TRACY SERVICE CENTER
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25027008
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHARP Management Manual <br /> Former Tracy MGP Project Safety Plan (PSP) <br /> 5.7 SUBCONTRACTOR SAFETY PLAN(SSP)SUBMISSION REVIEW <br /> All subcontractors must submit safety programs to the Parsons Project Manager and Division <br /> Safety Manager for review before they begin work on site. The Plan will be reviewed for <br /> adequacy in accordance with the SSP template. <br /> For this project, there will be subcontractors directly hired by Parsons, which will require the <br /> preparation of SSPs by each of the subcontractors working at the Site. <br /> 5.7.1 Contractor Site-Specific Safety Plans <br /> At least 10 days before work begins, each contractor must submit two copies of its subcontractor <br /> safety program (SSP) to the Parsons Project Manager and Division Safety Manager for review. <br /> The Project Manager and Division Safety Manager review the SSP to ensure that it meets <br /> Parsons' requirements. <br /> If a contractor needs assistance developing an SSP, an electronic copy of Parsons' HAZWOPER <br /> Model SSP template is posted on ParShare. <br /> The SSP must address the following elements: <br /> • Responsibility <br /> • Compliance <br /> • Communication <br /> • Hazard assessment <br /> • Accident exposure and investigation <br /> • Hazard correction <br /> • Training and instruction <br /> • Recordkeeping <br /> The SSP must include applicable requirements of Parsons PSP and OSHA CFR 1910/1926: <br /> • Scope of work evaluation that describes the sequence of work and associated hazardous <br /> activities. <br /> • Specific activity hazards analysis(AHA). <br /> • A project site employee orientation program that addresses location specific issues <br /> relative to safety and health. <br /> • A site-specific emergency action plan that includes a list of key management contacts <br /> with home office,project site, home, and cellular telephone numbers. <br /> • A site-specific medical emergency plan that lists qualified first aid personnel by name <br /> and includes copies of their current certificates. <br /> • Key line management personnel,by name and position, who will enforce the SSP. <br /> • Key competent or qualified personnel by name and copy of current documentation <br /> identifying specific certified competency (e.g., scaffolding, excavations, and fall <br /> protection). <br /> • Written progressive disciplinary program for violations of safety procedures. <br /> • Trenching and shoring plan(if applicable). <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.