Laserfiche WebLink
rxe tr <br /> SHARP Management Manual <br /> 44-MO-0 Former Tracy MGP Project Safety Plan (PSP) <br /> SECTION 8 -RECORDKEEPING AND POSTING <br /> Parsons and its subcontractors must comply with the recordkeeping requirements of OSHA, the <br /> Owner, Parsons Corporation, and this safety program, including: <br /> • OSHA 300 logs <br /> • Medical treatment and follow up <br /> • Cranes <br /> • Heavy equipment inspection logs <br /> • Fall protection <br /> • Training <br /> • Inspections <br /> • Audits <br /> • Others as required <br /> The Project Manager is the official record keeper for files relating to Parsons' employees. Each <br /> subcontractor maintains its own files. <br /> The project displays OSHA posters in conspicuous places as required by OSHA, including one <br /> poster on the main bulletin board located in the Walnut Creek Office. The OSHA 300 log for the <br /> project or the GBU shall be posted from February 1 —April 30 of each calendar year. <br /> 42 <br />