Laserfiche WebLink
♦��y <br /> \)ye SHARP Management Manual <br /> ''�w.e•+e Former Tracy MGP Project Safety Plan(PSP) <br /> Activity Hazards Analysis <br /> Page_of <br /> Project Nome&Number.PG&E Former AHA No. Date: 10/6/2006 New: <br /> Tracy MGP Site <br /> Location:Tracy,CA Contractor:xxx Revised: <br /> Required Personal Protective Equipment Analysis by:Thomas Blaney Date:7/30/2007 <br /> Level D Modified/Respiratory protection <br /> if required based on monitoring results • <br /> Superintendent/Competent Person: Reviewed by: Date: <br /> Thomas Blaney <br /> Work TasktAetivity.Backfill of excavations Approved by: Date: <br /> Hazards Preventive or Corrective Measures <br /> • Only qualified operators will be allowed to operate heavy equipment,per safe work guidelines included in the OSHA General <br /> Industry(29 CFR 1910)and Construction Industry(29 CFR 1926)standards. <br /> Equipment • Personnel will never walk directly behind or to the side of operating equipment without the operator's knowledge. <br /> Operation • Do not wear loose-fitting clothing or other items such as rings or watches that could get caught in moving parts. Long hair will <br /> be restrained. <br /> • Store excavated spoils>3 feet from excavation edge <br /> Open • Inspect daily for slope stability—Excavation Competent person <br /> excavations • Remove any ponding water/maintain dust control measures as necessary <br /> • Store excavated spoils>3 feet from excavation edge <br /> • Use proper traffic control(cones,advance warning signs)when blocking traffic lanes or shoulders. . <br /> Vehicle Traffic • All vehicles used at the site,including personal and rental vehicles,must be inspected and decontaminated prior to leaving site. <br /> • Wear an orange traffic safety vest when working around heavy equipment or near vehicular traffic. <br /> A-6 <br />