Laserfiche WebLink
samples when cuttings reach the surface Label and preserve each sample in <br /> containers Clearly mark each container with well designation, date, time, and depth <br /> interval represented Store the samples in a manner that prevents breakage or loss <br /> A Prepare a complete lithologic drilling log and furnish to the Engineer within 24 <br /> hours of the end of test hole drilling <br /> B The Contractor shall provide the Engineer with Grain Size Distribution Analyses <br /> results for up to 30 formation samples per test hole The "test" formation <br /> samples will be identified by the Engineer Analyses shall he performed either <br /> by the Contractor (if the Contractor operates an in-house qualified soils <br /> laboratory) or by a subcontracted independent qualified soils laboratory <br /> Analyses shall be performed in accordance wtih ASTM D-422, "Standard Method <br /> for Particle-Size Analyses of Soils" as applicable to drill cuttings Grain size <br /> distribution data shall be reported as a function of cummulative weight retained <br /> on the following sieve sizes <br /> U S Standard Size of Openings <br /> Sieve No Inches <br /> 114 0 250 <br /> 4 0 187 <br /> 6 0 132 <br /> a 00931 <br /> 12 00661 <br /> 16 00469 <br /> 20 00331 <br /> 30 00232 <br /> 50 00117 <br /> 100 00059 <br /> 140 00041 <br /> PAN 00000 <br /> The Grain Size Distribution Analyses results shall be submitted to the Engineers within <br /> 72 hours of performing the geophysical log <br /> SECTION 9 — INCOMPLETION OF TEST HOLE <br /> PART 1 - GENERAL <br /> DESCRIPTION <br /> In the event that a test hole cannot be completed as specified due to lost tools or other <br /> reasons attributed to the Contractor, the Contractor shall abandon the test hole, shall <br /> move the drilling equipment to a new location selected by the Engineer, and shall a new <br /> test hole to the specified depth <br /> August 2001 Division 111 -12 Ball Park& Park & Ride Wells Ph 1 <br />