My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
samples when cuttings reach the surface Label and preserve each sample in <br /> containers Clearly mark each container with well designation, date, time, and depth <br /> interval represented Store the samples in a manner that prevents breakage or loss <br /> A Prepare a complete lithologic drilling log and furnish to the Engineer within 24 <br /> hours of the end of test hole drilling <br /> B The Contractor shall provide the Engineer with Grain Size Distribution Analyses <br /> results for up to 30 formation samples per test hole The "test" formation <br /> samples will be identified by the Engineer Analyses shall he performed either <br /> by the Contractor (if the Contractor operates an in-house qualified soils <br /> laboratory) or by a subcontracted independent qualified soils laboratory <br /> Analyses shall be performed in accordance wtih ASTM D-422, "Standard Method <br /> for Particle-Size Analyses of Soils" as applicable to drill cuttings Grain size <br /> distribution data shall be reported as a function of cummulative weight retained <br /> on the following sieve sizes <br /> U S Standard Size of Openings <br /> Sieve No Inches <br /> 114 0 250 <br /> 4 0 187 <br /> 6 0 132 <br /> a 00931 <br /> 12 00661 <br /> 16 00469 <br /> 20 00331 <br /> 30 00232 <br /> 50 00117 <br /> 100 00059 <br /> 140 00041 <br /> PAN 00000 <br /> The Grain Size Distribution Analyses results shall be submitted to the Engineers within <br /> 72 hours of performing the geophysical log <br /> SECTION 9 — INCOMPLETION OF TEST HOLE <br /> PART 1 - GENERAL <br /> DESCRIPTION <br /> In the event that a test hole cannot be completed as specified due to lost tools or other <br /> reasons attributed to the Contractor, the Contractor shall abandon the test hole, shall <br /> move the drilling equipment to a new location selected by the Engineer, and shall a new <br /> test hole to the specified depth <br /> August 2001 Division 111 -12 Ball Park& Park & Ride Wells Ph 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.