My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002230
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:11:18 AM
Creation date
1/23/2020 9:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002230
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> BALL PARK AND PARK & RIDE WELL CONSTRUCTION (PHASE 1) <br /> DRILL, CASE 8 ANALYZE WELLS <br /> CIP 7542 <br /> DIVISION I - GENERAL REQUIREMENTS <br /> Notice Inviting Bids 1-1 <br /> Information to Bidders 1-3 <br /> DIVISION II - SPECIAL REQUIREMENTS <br /> Section 1 - Definitions II-1 <br /> Section 2 - Description of Work II-1 <br /> Section 3 - Drawings, Specifications and Permits II-2 <br /> Section 4 - General Prevailing Rate of Per Diem Wages II-3 <br /> Section 5 - Preconstruction Conference 11-3 <br /> Section 6 - Progress Schedule and Order of Work II-3 <br /> Section 7 - Pay Items 11-4 <br /> Section 8 - Quantities 11-4 <br /> Section 9 - Timing of Construction II-4 <br /> Section 10 - Sequence of Construction Activities 11-5 <br /> Section 11 - Right-of-Ways and Construction Easements 11-5 <br /> Section 12 - Progress Meetings II-6 <br /> Section 13 - Preservation of Property 11-6 <br /> Section 14 - Protection of Existing Utilities 11-6 <br /> Section 15 - No Parking Signs II-7 <br /> Section 16 - Dust and Noise Control 11-8 <br /> Section 17 - Disposal of Material 11-9 <br /> Section 18 - Construction Water 11-9 <br /> Section 19 - Water and Sewer Shutdown I1-10 <br /> Section 20 _ Inspection 11-10 <br /> Section 21 Testing 11-11 <br /> Section 22 - "As-Built" Plans II-11 <br /> Section 23 - Coordination with Adjacent Property Owners and 11-11 <br /> Maintained Access to Properties <br /> Section 24 - Project Site Safety 11-12 <br /> Section 25 - Supervision of Work I1-12 <br /> ' Section 26 -- Prosecution of the Work I1-12 <br /> Section 27 — Boundaries of the Work II-12 <br /> Section 28 —Temporary Shut Down 11-13 <br /> Section 29 —Terms 11-13 <br /> Section 30 — Permits, Certificates, laws and Ordinances 11-13 <br /> Section 31 — Equipment and Operating Requirements I1-13 <br /> Section 32 —Cooperation 11-13 <br /> . Section 33 — Existing Facilities II-14 <br /> Table of Contents <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.