Laserfiche WebLink
SECTION 16 — PLUMBNESS TEST ALIGN TEST AND WELL DEVELOP (Bid Item <br /> ' No s A17, 1317, A18, 1318, A19, 1319, A23 & B23) <br /> PART 1 - GENERAL <br /> 101 DESCRIPTION <br /> This section includes materials, procedures and installation for the plumbness test, <br /> ' alignment test, and development of the wells by surging and simultaneous airlifting, <br /> followed by pumping with a test pump <br /> 102 MEASUREMENT AND PAYMENT <br /> A Plumbness and Alignment Tests shall be paid for on a lump sum basis The <br /> ' contract lump sum price paid for Plumbness and Alignment Tests (Bid Item <br /> No s 23A & 23B) shall include full compensation for conforming to these <br /> requirements, furnishing all the labor, materials, tools, equipment, incidentals <br /> ' and for doing all the work involved in Plumbness and Alignment Tests complete <br /> in place, all as specified in the Standard Specifications, these Special Provisions, <br /> and as directed by the Engineer and no additional compensation will be allowed <br /> Measurement will be based on the percentage of work completed as determined <br /> ' by the Engineer <br /> B Development and Test Pumping shall be measured on the actual number of <br /> hours of Development and Test Pumping Measurement will be based on the <br /> actual number of hours of Development and Test Pumping done The contract <br /> unit price paid for Development and Test Pumping (Bid Item No s A19 & B19) <br /> ' shall include full compensation for conforming to these requirements, furnishing <br /> all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in Development and Test Pumping, complete in place, as specified in <br /> the Standard Specifications, these special provisions and as directed by the <br /> Engineer and no additional compensation will be allowed <br /> C Airlift Swabbing shall be measured on the actual number of hours of Airlift <br /> Swabbing done Measurement will be based on the actual number of hours of <br /> Airlift Swabbing done The contract unit price paid for Airlift Swabbing (Bid Item <br /> No s A17 & B17) shall include full compensation for conforming to these <br /> ' requirements, furnishing all the labor, materials, tools, equipment, incidentals <br /> and for doing all the work involved in Airlift Swabbing, complete in place, as <br /> specified in the Standard Specifications, these special provisions and as directed <br /> ' by the Engineer and no additional compensation will be allowed <br /> D Test Pump Installation and Removal shall be paid for on a lump sum basis The <br /> contract lump sum price paid for Test Pump Installation and Removal (Bid Item <br /> ' No s A18 & B18) shall include full compensation for conforming to these <br /> requirements, furnishing all the labor, materials, tools, equipment, incidentals <br /> and for doing all the work involved in Test Pump Installation and Removal, not to <br /> be included in the hourly cost of development, complete in place, all as specified <br /> in the Standard Specifications, these Special Provisions, and as directed by the <br /> ' August 2001 Division 111 -28 Ball Park& Park& Ride Wells Ph 1 <br />