Laserfiche WebLink
SCHEDULE OF PRICES <br /> ' BALL PARK AND PARK & RIDE WELL CONSTRUCTION (PHASE 1) <br /> DRILL, CASE &ANALYZE WELLS <br /> CIP 7542 <br /> All applicable sales taxes, state and/or federal, and any other special taxes, patent <br /> rights or royalties are included in the price quoted in the bid In case of discrepancy <br /> ' between the written words and the figures in the "Total" column, the written words shall <br /> prevail In case of discrepancy between the figures in the "Total" column and the sum of <br /> those amounts set forth in the Total Bid Price, the amounts indicated in the "Total" <br /> column shall prevail, and the amount shown as the Total Bid Price shall be adjusted <br /> accordingly <br /> BID ITEMS AS FOLLOWS: <br /> SCHEDULE A - BALL PARK WELL <br /> ' ITEM ESTIMATED DESCRIPTION & UNIT PRICE UNIT TOTAL <br /> No QUANTITY WRITTEN IN WORDS PRICE IN <br /> FIGURES <br /> ' Al Lump Sum Mobilization and Demobilization <br /> dollars $ $ <br /> and cents per lump sum <br /> A2 50 Linear Well Surface Casing (40" Conductor) <br /> Feet dollars $ $ <br /> ' and cents per linear foot <br /> ' A3 950 Linear Drill 18-inch test hole <br /> Feet dollars $ $ <br /> and cents per linear foot <br /> A4 Lump Sum Geophysical Logging <br /> dollars $ $ <br /> and cents per lump sum <br /> ' A5 5 Each Water Quality Sampling <br /> dollars $ $ <br /> ' and cents per each <br /> A6 400 Linear Temporary Test Hole Stabilization <br /> Feet dollars $ $ <br /> and cents per linear foot <br /> A7 950 Linear Drill 32-inch Bore Hole <br /> Feet dollars $ $ <br /> and cents per linear foot <br /> August 2001 Division IV-6 Ball Park& Park & Ride Wells Ph l <br />