Laserfiche WebLink
WELL MONITORINGISAMPLING <br /> FIELD DATA SHEET <br /> Client! CA��� <br /> Facility # - X63 Z Job#: „ <br /> Address: Date: <br /> City: Sampler: c., <br /> Well ID M W-Z Well Condition: a• <br /> r <br /> Well Diameter — L Hydrocarbon Amount Bailed <br /> C� Thickness: Iproductlweter). <br /> Total Depth `• Volume 2'- 0.17 3"—038 4" 0.66 <br /> F�ar(VF) 6"- 1.50 12" -5.80 <br /> Depth to Water 71d I <br /> 1 X VF �:�1_ �+ X3 (case volume) Estimated Purge Volume: <br /> Purge sa a Baiter Sampling <br /> Equipment: Bailer (Equipment: cqigsable Bei e <br /> Stade Bailer <br /> Suction Pressure Bailer <br /> Grundfas Grab Sample <br /> Other. Other: <br /> Starting True: /0Z0 Weather Conditions: ✓ <br /> Sampling Tints: 1031 Water Color: 6 amu► Odor- <br /> Purging Flow Rate: - - _ �' •••,••• S"merrt Description: <br /> Did well de-water? " yea; Time; Volume: MA I <br /> Titin Volume pH Canductivity TeinFesabm D.O. ORP ADc UnW <br /> (PL) 'C (mSOL) (mh (Ppm) <br /> G.0 ��.1� _ <br /> ,^offAQ, <br /> LABORATORY INFOi mAnON <br /> SAMPLE 10 tf- CONTAINER FIEFRIG. PRESERV.TYPE LABORATORY ANALYSES <br /> t-- 3 x Vag VI A�.. He S- K- m ro <br /> 92A <br /> COMMENTS: <br />