Laserfiche WebLink
f <br /> I <br /> Engineering Geology •Hydrogeology <br /> Ground-Water Exploration&Development <br /> Ground-Water Resource Management <br /> 1450 Koll Circle,Suite 114 <br /> San Jose, California 95112 <br /> Telephone (408)453-2541 <br /> Fax (408)453-2543 <br /> I <br /> September 29, 1995 <br /> Project No. G758-09 <br /> Mr. Richard Blaine <br /> Blaine Tech Services, Inc. <br /> ` 985 Timothy Drive <br /> I San Jose, CA 95133 <br /> I <br /> RE: GROUND WATER ELEVATION CONTOUR MAP <br /> ' FORMER CHEVRON SERVICE STATION NO. 9-8632 <br /> 575 GRANT LINE ROAD <br /> TRACY, CALIFORNIA <br /> Dear Mr. Blaine: <br /> In accordance with your request, we have prepared a map <br /> showing the most recent ground-water elevation contours at <br /> this site. The depth to the water table was measured in the <br /> monitoring wells by Blaine Tech Services, Inc. on September <br /> 7 , 1995. The ground-water elevation contours extrapolation <br /> and the general direction of the ground-water gradient <br /> indicated are to be considered only approximate in nature. <br /> If you have any questions regarding the map, please <br /> call. <br /> Very truly yours, <br /> GEOCONSULT , I <br /> I <br /> r <br /> ohn K. Hofer <br /> Engineering ologist, EG-1065 <br /> 4 TTI JKH:dw <br /> (CH98632.995) <br /> I <br /> i <br /> I <br />