My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002323
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002323
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:09:29 AM
Creation date
1/23/2020 9:52:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002323
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date April 15,2002J a�CO <br /> L 1 II++JJ VVR <br /> International Incorporated <br /> L "� li� <br /> CHEVRON GROUNDWATER MONITORING REPORT (1Q2002) <br /> Primary Agency Harlin Knoll <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton, CA 95202 <br /> Facility No 9-8632 Address 575 West Grant Line Road,Tracy,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International,Inc — Brian Silva <br /> Consultant Project No 77CH 00000 00 0021 <br /> Assembly Bill 681 Status Property Owner Stella Rickman, Tracy, CA <br /> WORK PERFORMED THIS QUARTER: First Quarter—2002- <br /> I Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> 3 Installation of four new onsite groundwater monitoring wells <br /> WORK PROPOSED FOR NEXT QUARTER: Second Quarter- 2002. <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 Submit Site Assessment Report <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling/Site Avsessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 610 to 6 62 feet <br /> Groundwater Gradient Northwest @ 0 005 ft/ft <br /> 1 , <br /> 3017 Kilgore Roast, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor cam <br />
The URL can be used to link to this page
Your browser does not support the video tag.