My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002325
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
575
>
2900 - Site Mitigation Program
>
PR0542420
>
ARCHIVED REPORTS_XR0002325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 10:05:37 AM
Creation date
1/23/2020 9:53:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002325
RECORD_ID
PR0542420
PE
2960
FACILITY_ID
FA0024376
FACILITY_NAME
FORMER CHEVRON 98632
STREET_NUMBER
575
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
575 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Prodw_k Comp rrt� 3 <br /> Ch,Nron It mon tO 8612,575(avnl I ins Ru id I i rLN C ddorni L -_-- Nu\LmhLr 2 i 2000 <br /> be drilled to approximately 20 feet bgs After Installation, the newly <br /> constructed wells will be developed, sampled, and surveyed <br /> • Soil and Groundwater Sample Analysts Soil and groundwater <br /> samples will be submitted to a Califoi nia State-certified laboratory <br /> and analyzed for the presence of TPHd, TPHg, BTEX, and the fuel <br /> oxygenates methyl teitiary butyl ether (MtBE), ethyl tertiary butyl <br /> ether (EtBE), di-Isoptopyl ether (DIPS), tertiary amyl methyl ether <br /> (TAME), tertiary butanol (TBA), ethylene dibromide (EDB), 1-2 <br /> dichloroethane (1-2 DCA), methanol, and ethanol At a minimum <br /> the capillary fringe and bottom soil samples will be submitted for <br /> analysis <br /> • Feasibility Testing Upon the completion of the proposed wells, a <br /> dual phase exti action feasibility test will be perfoi coed to assist in the <br /> selection of an appropi tate remedial alternative <br /> • Rehoi t A i eport will be pi epared after completion of necessary <br /> fieldwork and upon i eceipt of labor atory analytical results The <br /> report will Include bol in,, logs and well construction details, a site <br /> map analytical results, chain-of-custody documentation and <br /> findings <br /> Proposed field and laboratory procedure,, are presented as Attachment A <br /> t ICh�vrun\9XG121R�t ort.1�'I'R 1 2 ;4 mei dl dn, <br />
The URL can be used to link to this page
Your browser does not support the video tag.