Laserfiche WebLink
�P�r f oRN�9 <br /> I <br /> CALIFORNIA WATER SERVICE <br /> W <br /> Z9rFR SEPI``. <br /> March I5,2019 � <br /> Dillon& Murphy Engineering <br /> 847 N Cluff Avenue, Suite A-2 <br /> Lodi,CA <br /> (Emailed to mtoy@dillonandmurphy.com) <br /> Will Serve Letter <br /> 447 N Anteros Ave—APN: 143-380-28 <br /> Dear Mike Toy, <br /> California Water Service Company Stockton District("Cal Water")has determined that water is available to <br /> serve the above-referenced project based on the information provided. Cal Water agrees to operate the water <br /> system and provide service in accordance with the rules and regulations of the California Public Utilities <br /> Commission(CPUC)and the company's approved tariffs on file with the CPUC. This determination of water <br /> availability shall remain valid for two years from the date of this letter. If construction of the project has not <br /> commenced within this two year time frame,Cal Water will be under no further obligation to serve the project <br /> unless the developer receives an updated letter from Cal Water reconfirming water availability. Additionally, <br /> Cal Water reserves the right to rescind this letter at any time in the event its water supply is severely reduced <br /> by legislative,regulatory or environmental actions. <br /> Cal Water will provide such potable water at such pressure as may be available from time to time as a result <br /> of its normal operations per the company's tariffs on file with the CPUC. Installation of facilities through <br /> developer funding shall be made in accordance with the current rules and regulations of the CPUC including, <br /> among others,Tariff Rules 15 and 16 and General Order 103-A. In order for us to provide adequate water for <br /> domestic use as well as fire service protection,it may be necessary for the developer to fiord the cost of special <br /> facilities, such as,but not limited to, booster pumps, storage tanks and/or water wells,in addition to the cost <br /> of mains and services. Cal Water will provide more specific information regarding special facilities and fees <br /> after you provide its with your improvement plans,fire department requirements,and engineering fees for this <br /> project. <br /> This letter shall at all times be subject to such changes or modifications by the CPUC as said Commission <br /> may, from time to time,require in the exercise of itsjurisdiction. <br /> If you have any questions regarding the above,please call me at(209)464-8311. <br /> Since./� %p <br /> ret Dahlen <br /> Construction Superintendent—Stockton District <br /> cc: Ting I3e—Cal Water Engineering Dept <br /> Pile <br /> JCir�ality. �ervia>. 'lnue. �! <br /> calwater.com � --` <br />