My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012967
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
1748
>
2600 - Land Use Program
>
PA-1900305
>
SU0012967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:27:01 PM
Creation date
1/23/2020 10:15:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012967
PE
2632
FACILITY_NAME
PA-1900305
STREET_NUMBER
1748
Direction
S
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205-
APN
17304003, 17304004, 17304076
ENTERED_DATE
1/22/2020 12:00:00 AM
SITE_LOCATION
1748 S MARIPOSA RD
RECEIVED_DATE
1/14/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2 - <br /> Community Development Department <br /> PA- 1900305 ( SA) <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication . ) (Development Title Section 9 - 1150 . 5 ) <br /> 4 . The owner shall execute an Irrevocable Offer to Dedicate Road to result in a 55 - foot wide right- of- <br /> way from the centerline of Mariposa Road to the property line across the parcel ' s frontage . (A fee <br /> based on the current fee schedule is required for processing per Development Title Table 9 -240 . 2 in <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for <br /> dedication . ) (Development Title Section 9 - 1150 . 5 ) <br /> 5 . The Traffic Impact Mitigation Fee shall be required for this application . The fee is due and payable <br /> at the time of building permit application . The fee shall be automatically adjusted July 1 of each <br /> year by the Engineering Construction Cost Index as published by the Engineering News Record . <br /> (Resolution R- 00433 ) <br /> 6 . The Regional Transportation Impact Fee shall be required for this application . The fee is due and <br /> payable at the time of building permit application . The fee will be based on the current schedule at <br /> the time of payment . (Resolution R- 06 -3 8 ) <br /> 7 . A copy of the Final Site Plan shall be submitted prior to release of building permit . <br /> 8 . The developer shall provide drainage facilities in accordance with the San Joaquin County <br /> Development Standards . Retention basins shall be fenced with six ( 6 ) foot high chain link fence or <br /> equal when the maximum design depth is 18 inches or more . Required retention basin capacity <br /> shall be calculated and submitted along with a drainage plan for review and approval, prior to <br /> release of building permit . (Development Title Section 9 - 1135 ) <br /> 9 . This project falls within the definition of a Regulated Project as defined in either the County Post- <br /> Construction Standards Manual or the County Phase II National Pollutant Discharge Elimination <br /> System (NPDES ) permit and shall comply with the following conditions . <br /> a) A registered professional engineer shall design a system or combination of systems to treat, <br /> filter or infiltrate the 85th percentile storm as defined in the County ' s 2009 SWQCCP . The <br /> system design shall follow standards as outlined in the 2009 Storm Water Quality Control <br /> Criteria Plan and comply with the conditions of the County Phase I NPDES permit . Plans <br /> and/or calculations of the proposed system shall be submitted to the County for review and <br /> approval prior to clearance for plan check . <br /> b ) All Priority New Development and Significant Redevelopment Projects must meet the volume <br /> reduction requirement outlined in the County ' s SWQCCP . <br /> c) The proposed project disturbs less than one ( 1 ) acre of ground and is not part of a larger plan of <br /> comment development . The construction phase of the proposed project shall follow best <br /> management practices of the Country " Small Site Storm Water Management Plan" . <br /> d) Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system . The property owner shall also be responsible for the payment to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.