Laserfiche WebLink
Potentially Less Than Less Than Analyzed <br /> Significant Significant vrith Significant No In The <br /> 9 M1�1itigatien 9 <br /> Impact Incorporated Impact Impact Prior EIR <br /> XIX,UTILITIES AND SERVICE SYSTEMS. <br /> Would the project <br /> a) Require or result in the relocation or construction of new <br /> or expanded water,wastewater treatment,or storm water <br /> drainage, electric power, natural gas, or <br /> telecommunications facilities, the construction or ❑ ❑ [` ❑ <br /> relocation of which could cause significant environmental <br /> effects? <br /> b) Have sufficient water supplies available to serve the <br /> project and reasonably foreseeable future oevelopment ❑ ❑ ® ❑ El <br /> normal.dry and multiple dry years? <br /> c) Result in a determination by the wastewater treatment <br /> provider which serves or may serve the project that it has <br /> adequate capacity to serve the project's projected ] El © E] El <br /> m addition to the provider's existing <br /> commitments? <br /> d) Generate solid waste in excess of State or local <br /> standards, or m excess of the capacty of local <br /> infrastructure.or otherwise impair the attainment of solid ❑ ❑ ❑ <br /> waste reduction goals? <br /> e) Comply with federal, stare. and local management and <br /> reduction statutes and regulations related to solid waste? ❑ ❑ ❑ Z J <br /> Impact Discussion: <br /> a-c) There are no pubic services available in this area for water, sewer. or storm water drainage Parcels zoned as <br /> agncu tural may use a well for water,a septic tank.for sever,and retain all drainage on-site. Any new development <br /> wi l have to be accommodated by ac on-site well for water and septic system for sewage. Stormwater drainage <br /> wit have to be retained on-site.Department of Public works will determine the feasibility of the stormwater drainage <br /> system. <br /> A Soil Su tability/Nitrate Loading study approved by the Enwro-imental Health Department has determined that the <br /> soil of the project site can support the use of septic tanks and that the septic system proposed by the project <br /> applicant can meet all on-site wastewater disposal standards. Additionally, Conditions of Approval from the <br /> Environmental Health Department will ensure that the water supply can meet all applicable regulations. <br /> 2? <br /> Planning Commission Staff Report, Item # 1 02/06/2020 — PA-1800316 (UP) 30 <br /> Environmental Review <br />