Laserfiche WebLink
oP° SAN JOAQUIN COUNTY <br /> COMMUNITY DEVELOPMENT DEPARTMENT <br /> �. 1810 E.HAZELTON AVE.,STOCKTON,CA 95205.6232 <br /> ;jF.... PHONE:209/468-3121 FAX:209/468.3163 <br /> DATE: January 9, 2019 <br /> PA-1800316 (UP) <br /> Property owner: Ahmed Hussein <br /> Applicant: Same <br /> APN /Address: 7300 West Delta Ave Tracy <br /> Planner: Giuseppe Sanfilippo <br /> Project Description:Slaughterhouse Building and Chicken Enclosure Building <br /> BUILDING CODE REQUIREMENTS: The following California Building Code (CBC) and San <br /> Joaquin County Ordinance requirements will be applicable to the proposed project. The <br /> following conditions shall be addressed prior to submittal of a building permit application to the <br /> Building Inspection Division: <br /> 1. A building permit for each separate structure or building is required. Submit plans, <br /> Specifications and supporting calculations, prepared by a Registered Design <br /> Professional (architect or engineer)for each structure or building, showing compliance with <br /> The 2016 California Building, Existing Building, Mechanical, Plumbing, Electrical, Energy <br /> and Fire Codes as may be applicable. Plans for the different buildings or structures may be <br /> combined into a single set of construction documents, <br /> 2. A grading permit.will be required for this project. Submit plans and grading calculations, <br /> including a statement of the estimated quantities of excavation and fill, prepared by a <br /> Registered Design Professional, The grading plan shall show the existing grade and <br /> finished grade in contour intervals of sufficient clarity to indicate the nature and extent of the <br /> work and show in detail that it complies with the requirements of the code. The plans shall <br /> show the existing grade on adjoining properties in sufficient detail to identify how grade <br /> changes will conform to the requirements of the code. <br /> 3. The required plans must be complete at the time of submittal for a building permit. Plans <br /> must address building design and construction, fire and life safety requirements, <br /> accessibility and show compliance with the current California codes and San Joaquin <br /> County ordinances. A complete set of plans must include fire sprinkler plans, truss design <br /> submittals, metal.building shop drawings, structural plans and calculations, plumbing, <br /> electrical and mechanical drawings and energy report. <br /> 4. A soils report is required pursuant to CBC § 1803 for foundations and CBC appendix § <br /> J104 for grading. All recommendations of the Soils Report shall be incorporated into the <br /> construction drawings. <br /> 5. For each proposed new building, provide the following information on the plans: <br /> a. Description of proposed use <br /> b. Existing and proposed occupancy Groups <br /> c. Type of construction <br /> d. Sprinklers (Yes or No <br /> e. Number of stories <br /> 1 � Pa `� e <br />