Laserfiche WebLink
UP/SA/IP <br /> ENVIRONMENTAL INFORMATION <br /> Water Drainage and Flooding <br /> Describe the current depth of the ground water and depth to potable water. <br /> From soils report ground water depth varies from 9.5'to 15'below grade <br /> Describe any existing drainage courses or eroded areas on or near the project site(e.g.rivers creeks,swales or drainage ditches): <br /> None Exist <br /> Describe any areas subject to flooding(including flood depths and flood panel map number): <br /> None Exist.Zone X—Areas of minimal flooding Map Number 06077CO57OF <br /> Land,Land Use and Biota <br /> Describe the site's topography(e. ,land forms slopes,etc.): <br /> The site is generally flat sloping from south to north with less than 1%across the property <br /> Describe agricultural land that will be lost as a result of the project(type of crops,acres,quality of soil etc.): <br /> Refer to Mountain House Development Environmental Impact Report. Site is currently not used foragriculture. <br /> Describe any wildlife habitat on-site andspecies that are of may be resent: <br /> Refer to Mountain House Development Environmental Impact Report <br /> Describe any vegetation on-site by type and extent: <br /> The site is vacant and generally covered in natural occurring tall mustard weeds and local grasses <br /> Air Quality <br /> Describe air pollutants that may result from the project(e.g.construction related dust vehicle trips per day,fire places,incinerators etc.): <br /> There will be construction related impacts to air quality(dust,vehicle exhaust). Upon completion of project,air quality impacted by customer and <br /> employee vehicle tris as well as trucks for product delivery <br /> Other <br /> Describe any items of historical or archaeological interest on-site(e.g.cemeteries or structures): <br /> None exist to the best of our knowled e <br /> Describe any on-site or off-site sources of noise or vibration e. .freeway noise heavy equipment,etc.): <br /> During construction there will be on-site noises and vibration due to typical construction activities.Site grading,trenching,building construction. <br /> Describe any on-site or off-site sources of light of glare(e.g.parkinglot lighting,or reflective materials used): <br /> There will be on-site sources of light due to required parking lot luminaires. <br /> Describe any on-site or off-site source of odor(e.g.agricultural wastes): <br /> On-site sources of odor may be limited to preparation of food such as baking or grilling. <br /> Describe anydisplacement of people that will be caused by the project(e.g.numbers of people,housing units): <br /> No displacements of people of housing units. <br /> c <br />