Laserfiche WebLink
10/08/01 16:29 FAX Q02 <br /> N-001 V <br /> ENCROACHMENT PERMIT <br /> CITY OF TRACY <br /> Permit No.: �/ - � Date Of Issuance: <br /> Permit Valid Up To: PI-y e7:1 Project Cost: <br /> Inspection Deposit: 167 Permit Fee: <br /> (Acct. # 112-4633-405-R331) (Acct. # 112-4332-403) <br /> Engineering Fees Testing Fees: <br /> Performance Bond <br /> This permit is hereby issued to encroach on theTap <br /> from feet of for the purpose of <br /> 'tom ii=w.t&O M.D 1,) t TD 12 W 0 L L A--3.1 <br /> Name of applicant: V+ 0---r- V t 20 V11-e"tA �— <br /> Address, (a ? 14,LPhone: <br /> Approved by: Field Superintendent: �- <br /> Contact Phone Number: 3 f d 75; <br /> CONDITIONS OF PERMIT <br /> r <br /> he Permittee shall notify the Development & Engineering Services Department-Construction Inspection Division at <br /> 31-4460 or 831-4456 forty-eight(48) hours prior to start of work pertaining hereto. <br /> he Permittee agrees to perform work under this permit in accordance with the prevailing City Standards, Specifications <br /> nd shall comply with all existing codes and policies. <br /> ermittee shall notify Police & Fire Departments before starting construction of any work. <br /> entative starting date ef t- +— u- -V-- ls-fLs2-�--�4 <br /> 5. Tentative completion date_ _7_ 'S2 P.-*,r S <br /> 6. If construction is not started within 90 days from the issue date, this permit will be void unless otherwise stated in the <br /> special conditions. <br /> 7. Contractors must display name and phone number at work site- preferably on barricades. <br /> 8. The cost of emergency work required to restore unsatisfactory construction that becomes a hazard will be charged to the <br /> Permittee. <br /> S. Replace full concrete sidewalk squares, as required. by sawcutting along score marks. <br /> 10. Compaction tests shall be required on backfilled trenches at the expense of the Permittee (contact Construction <br /> Management or Development & Engineering Services Department). <br /> /11-11. Traffic control shall be in accordance with the Caltrans Traffic Manual, <br /> )44Z Trenching and resurfacing is to comply with Standard Plan No. 501 and 501A- <br /> 13, The time of construction will be limited between the hours of%M&A.M. and+i-P.M., Monday to Friday. Any request for <br /> work beyond the hours noted herein and any work on the weekends and holidays will require prior approval from the City. <br /> The Permittee shall pay for all additional City inspections beyond the normal working hours. <br /> 14. City inspections shall be performed Monday-Friday between 8:00 A.M. and 5:00 P-M. Any inspection performed beyond <br /> these hours, in accordance with Condition 13 of this permit, will be considered overtime and will be paid by the Permittee <br /> in advance to the Development & Engineering Services Department. <br /> 15. Non-compliance of City Codes, Plans, Specifications and conditions of this permit may result in fines and penalties as <br /> established by the City Council. <br /> 16. Permittee shall comply with the following special conditions: <br />