My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
10
>
3500 - Local Oversight Program
>
PR0545191
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:24:02 AM
Creation date
1/23/2020 11:02:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545191
PE
3528
FACILITY_ID
FA0005301
FACILITY_NAME
JERRY & BARBARAS DEMOLITION
STREET_NUMBER
10
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
10 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> n <br /> SECTION 1.0 INTRODUCTION <br /> The health and safety of all project personnel involved at the location of 10 West Grantline, Tracy,. <br /> CA 95376 preliminary site assessment investigation project is of primary importance. Therefore, <br /> this Health and Safety Pian was developed and is intended to be followed by all project personnel. <br /> It is the; responsibility of the Project Manager to implement and enforce the plan and any <br /> subsequent revisions, during the course of all operations at the site. <br /> 1A OVERVIEW <br /> i <br /> Wright Environmental Services, Inc. (WES) will drill exploratory borings for subsurface site <br /> assessment at the location of 10 West Grantline, Tracy, Ca 95376. <br /> i' <br /> The chemicalhazards expected to be encountered at the site may be organics and metals from <br /> gasoline or diesel fuel. The other hazards expected to be encountered during the project are <br /> exposure to physical hazards such as slipping, tripping, cuts, strains bruises,. smashing limbs from <br /> working around heavy equipment (pinch points), excessive noise, broken bones and heat stress. <br /> i <br /> I <br /> SECTION-2.0 PROJECT SAFETY AUTHORITY <br /> Personnel responsible for the on site project safety are the Project Manager, John Lynch and the <br /> Site Safety Officer, Rick Corfman. <br /> The Company Safety Officer,John Lynch is responsible for the dissemination of the information <br /> contained in the plan to the Project Manager and Site Safety Officer. <br /> As such, the Project Manager, John Lynch, is responsible for ensuring the following items are <br /> adequately addressed: <br /> • Safety Supplies & Equipment inventory <br /> Training Programs/Hazard Communication <br /> • Accident/Incident Reporting Procedures <br /> • ©ec,ntamination/Contamination Reduction Procedures <br /> The Project Manager, Project Superintenaent ano -the Site safety- Officer have the authority to <br /> suspend work anytime they determine that the provisions of the .plan are inadequate to ensure <br /> worker safety. The Project Site Safety Officer shall also inform the Project Manager of individuals <br /> whose conduct is not consistent with the requirements of tho mart <br />
The URL can be used to link to this page
Your browser does not support the video tag.