My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 12:02:14 PM
Creation date
1/23/2020 11:40:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> �r <br /> A S S O C I A T E S I N C . <br /> held screened with a Photo ionization Detection (PID) meter, and one.soil sample from each of <br /> the borings will be submitted for laboratory analysis. Soil sample selection will be based on PID <br /> measurements and field:observations(i.e. odor and soil discoloration). <br /> One groundwater sample will be collected from each boring at the depth groundwater is first <br /> encountered, anticipated to be approximately 6 feet bgs. A Geoprobe®R .Screen Point 15 <br /> Groundwater Sampler will be threaded onto the leading enol of the Geoprobe(5 when the <br /> groundwater is encountered. While the sampler is advanced, O-ring seals and an expendable <br /> drive point will provide a watertight system to ensure sample integrity. <br /> When the tool has been advanced to the desired depth, extension rods will be sent downhole to <br /> brace the bottom of the sample screen as the tool casing is retracted. When the casing is <br /> retracted, up to 41-inches of screen with slot sizes of 0.004 inches will be exposed. Teflon <br /> tubing with a check valve attached to one end will be inserted down the casing until it is <br /> immersed in groundwater. Water will then be pumped through the tubing and to the ground <br /> surface by oscillating the tubing up and down. . <br /> Following soil and groundwater sample collection, the borin's will be bacl<filled with neat- <br /> cement <br /> eatcement grout to the ground surface. Drill cuttings, if any, will be stored on-site in a 5-gallon <br /> container pending laboratory results. <br /> Sample Analvsis <br /> The selected soil and groundwater samples from the CPT and Geoprobet® borings will be <br /> immediately placed in a cooler with ice and delivered under chain-of-custody documentation to a <br /> State-certified analytical laboratory. Soil samples will be analyzed for TPHQ by EPA Method <br /> 8015B; benzene, toluene, ethyl-benzene, and xylenes (BTEX) by EPA Method 8021B; and <br /> MTBE, tertiary-amyl-methyl ether (TAME), 1,2-dibromoethane (EDB), 1,2-dichloroethane (1,2- <br /> DCA), di-isopropyl ether (RIPE), ethyl-tertiary-butyl. ether (ETBE), tertiary-butanol (TBA), <br /> ethanol (etOH), and methanol (meOH) by EPA Method 8260B. <br /> Summary Report Preparation <br /> Upon completion of the soil boring installation, a Summary Report will be prepared and will <br /> include a description of site activities and an assessment of the extent and impact of the residual <br /> hydrocarbons. <br /> All work described in this workplan will be performed under the direction .of a California <br /> Registered Geologist or Professional Engineer. All work will be performed in accordance with <br /> ATC's Site-specific Health,and Safety Plan (HASP) contained in Attachment 1 and Quality <br /> Control/Quality Assurance Plan contained in Attachment 2.' <br /> s Aenviromentai\2.SS47\3;\reports\wkp.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.