My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 11:57:15 AM
Creation date
1/23/2020 11:44:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� A <br /> ATC Associates Inc. <br /> 1117 Lone Palm Avenue,Suite 201 <br /> V Modesto,California 95351 <br /> 209-579-2221 <br /> fax:209-579-2225 <br /> A-S S O.0 I A T E,S: I..N C.. <br /> prepared in general accordance with SJCEHD reporting guidelines and will include <br /> recommendations as appropriate. <br /> All work described in this workplan will be,performed under the direction of a California <br /> Registered Professional Engineer or California Registered Professional Geologist. A copy of the <br /> soil boring permit application is provided as Attachment 1. <br /> i <br /> Proiected Schedule <br /> I <br /> i <br /> Once approval of this workplan has been received, ATC will initiate the permitting process with <br /> the Ci o Tracy and confirm a schedule for drilling activities. ATC will notify the SJCEHD at <br /> le 4 hours rior to beginning any field activities. The summary report will be submitted to the <br /> SJCEHD approximately 60 days after the completion of field activities. <br /> If you have any questions or require additional information regarding this workplan, please <br /> contact us at(209) 579-2221. <br /> Respectfully submitted, \0 NAj G <br /> ATC Associates Inc. <br /> y <br /> Nathan Christman, P.G. A JV0 j <br /> CA Professional Geologist No.8330 J' <br /> � P <br /> ��ALt C <br /> nne Homsey, P.E. <br /> CA Professional Civil Engineer No.47410 <br /> Attachments <br /> cc: Mr. Jay Chapman, The Customer Company <br /> Mr. Jim Barton, CRWQCB <br /> f <br /> SAEnvironmenta1\25847\37 Tracy\Reports\wkp-addendum 2009.doc 8 f <br />
The URL can be used to link to this page
Your browser does not support the video tag.