Laserfiche WebLink
ATC Associates Inc. <br /> YV/ATt, <br /> 1117 Done Palm Avenue, Suite 201 <br /> Modesto, California 95351 <br /> 209-579-2221 <br /> AS S O C I A T. E S I N :c: fax: 209-579-2225 <br /> i <br /> L <br /> Report Preparation <br /> Upon completion of the field activities, a report will be prepared describing the field activities 1 <br /> and laboratory analytical results. The report will include a detailed summary of the subsurface <br /> investigation and contaminant distribution, both in soil and groundwater. The report will be <br /> prepared in general accordance with SJCEHD reporting guidelines and will include <br /> recommendations as appropriate. <br /> The work described in this Workplan will be performed under the direction of a California <br /> Registered Professional Engineer or California Professional Geologist and will be performed in <br /> accordance with ATC's Site Specific Health and Safety Plan (HASP), previously submitted to <br /> the SJCEHD. <br /> Projected Schedule <br /> Following approval of the Workplan, ATC will obtain boring permits from the SJCEHD. Off- <br /> site access will be obtained prior to conducting that portion of the assessment. The summary <br /> report will be submitted to the SJCEHD approximately six weeks after the completion of field <br /> activities. <br /> If you have questions or require additional information regarding this Workplan, please contact <br /> us at(209) 579-2221. <br /> L..1 <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> r '77 <br /> Todd Hafner, P.G. <br /> CA Professional Geologist No. 8090 y ft + j '� r . <br /> a <br /> L �� civil <br /> Je e Hornsey, P.E. �' �` <br /> r A Professional Engineer No. 47410 - <br /> cc: Mr. John Johnson, The Customer Company <br /> Mr. Bob Matthews, More 4 Less <br /> Jim Barton, RWQCB <br /> 10 ATC Associates Inc. <br /> S:\Environmental\25847.0037\Work Plan additional vert-hor delineationTH2.doc <br /> L <br /> f <br />