Laserfiche WebLink
TABLE C1, continued <br /> WELL DATE TIME DEPTH GROUNDWATER <br /> TO ELEVATION <br /> WATER f xt amsl <br /> Beet <br /> MW-5 14 90 Fat. total depth, diameter 2-in. Rim Elevation: 27.46 <br /> Installed 09/01/95 F+onftring performed by Parker Ernvirormvntal Services from top of ring <br /> 9/26/95 11:24 6.37 21.09 <br /> 2/23/99 10:41 5.16 22.30 <br /> 6/27/99 8:18 595 2151 <br /> 8/31/99 9:23 628 2118 <br /> 7/3/00 9.40 5.08 22.38 <br /> MavWng performed by H2OGEOL Casing Elevation: 27 46 <br /> 11/19/00 8:48 6.58 2088 <br /> 2/23/01 08.51 5.26 22.20 <br /> 5/19/01 10:47 5.74 21.72 <br /> 8/18/01 11.24 6.34 2112 <br /> 11/17/01 10:54 5.70 21.76 <br /> 7/24/02 13:35 5.45 2201 <br /> Monitoring in abeyance pending receipt of Letter of Commitment. <br /> 2/17/03 920 5.36 2210 <br /> • <br /> MW-6 14.70 Ft total depth, diameter 2-in. Rim Elevation: 27.25 <br /> bisW sd 09/01/95 Monitoring performed by Parker&Mra rnwW1 SwAoes from Wp of casirg. <br /> 9/26/95 11:09 6.19 2106 <br /> 2/23/99 10.50 5.00 22.25 <br /> 6/27/99 8:19 5.79 21.46 <br /> 8/31/99 9:16 6.12 21.13 <br /> 2/3/00 10.00 5.13 22.12 <br /> blo FWdng performed by H2OGEOL Casing Elevation: 27 25 <br /> 11/19/00 8.53 642 20.83 <br /> 2/23/01 09.10 5.09 22.16 <br /> 5/19/01 10:52 5.60 2165 <br /> 8/18/01 11:28 6.19 2106 <br /> 11/17/01 10:51 5.56 21.69 <br /> 2/24/02 13:32 5.20 2205 <br /> Monitoring in abeyance pending receipt of Letter of Commitment <br /> 2/17/03 9:23 5.20 22.05 <br /> H 2OGEOL A oRMMWA EFt CONSL i.TANCY <br /> Table C1, Page 5 of 6 <br />