My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIKORSKY
>
2050
>
2800 - Aboveground Petroleum Storage Program
>
PR0544293
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2021 10:47:55 AM
Creation date
1/23/2020 1:07:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0544293
PE
2832
FACILITY_ID
FA0023280
FACILITY_NAME
JC AIR ACADEMY INC
STREET_NUMBER
2050
Direction
E
STREET_NAME
SIKORSKY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
01
SITE_LOCATION
2050 E SIKORSKY ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN Environmental Health Department <br /> CUUl <br /> Greotcess gnaws itur <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Nam.: I Facility Phoma: Data: <br /> JC AIR ACADEMY INC (209)9832700 January 16,2020 <br /> Facility Atldan: CERSID: <br /> 2050 E SIKORSKY ST, STOCKTON,CA 95206 10182505 <br /> Impaction Conrad: Tide. Phone: <br /> Edward Kwon President p- <br /> Insp.dien Type: hes". <br /> ROUTIN E INSPECTION-Operating Permit 2832-AST FAC 10K-</=100 K GAL CUMULATIVE <br /> Consent For: Consent G.By: <br /> Ox Inspection Ox Photos ❑Samples I Rodger Ainsworth, Fuel Tank Manager <br /> CCR=CaffmnaCWeM Regulatom HSC=HeMN md$Meiy Catle CFR=Title iO Cool Reguldom <br /> V=mi R=Re;earmcmn COS=Cori on 9le burns insd im <br /> Aboveground Petroleum Storage Act <br /> 101 HSC 252]0ad) Failed to pay APSA program annual fees oV in in COS <br /> 102 HSC 2590.4.5(.) Failed to prepare amen SPCC Plan In accord ance with CFR Pak 112 e V o R o COS <br /> 103 HSC 2590.6(.) Failed to He HMBP or amus facility tan k stated ant mV n mCOS <br /> 100 HSC 252]0.8 Faced to report sl)Ills or remakes d 42 gallons(one barrel)or more o V o R o COS <br /> 105 CFR 112.1(bN31,112.2 Fees,to prop any close tanks when malting a dam of perman key closed mV n mCOS <br /> 106 HSC 25004.1.2 Failed to submit acertif cation and w.idm response wild n 30 days for mi nor viol atiom mV n mCOS <br /> 10T HSC 252]0.2(.X4) Failure to prepare SPCC plan when facility no longer meets oil-filled electrical equipment exclusion mV n mCOS <br /> 108 HSC=0.4.5(a) Failure of conditionally exempt facility to conduct Inspections or Install secondary containment p n mCOS <br /> 109 HSC 2590.2(.H1HC) Failure to have secondary containment andlor leak detection ifTNGA piping cannot be viewed mV n mCOS <br /> (wHill) <br /> 110 HSC 25C04(ei Failed to report program data In the California Environmental Reporting System(CERS) mV n mCOS <br /> 111 HSC 2590.2(.X8) Failure of a TIUGA wiM less than 55 gallons capacity to have secondary containment and a log mV n mCOS <br /> 112 CFR 112.20(e) Failure to complete and maintain a Substantial Harm Criteria certification p p oCOS <br /> Requirement to Pr Implants M a SPCC Plan <br /> 201 CFR 112.3(4) Failure to have a licensed PE properly rehewand caddy the SPCC plan oV .R .COS <br /> 202 CFR 112.3(ei Fall maintain a copy ofthe Plan on site mV n mCOS <br /> 203 CFR 112.3 Falure to implement the SPCC Plan mV n mCOS <br /> 200 CFR 112.3(g) Failure to prepare SPCC Plan when facility no loinger meds Qualified Fady criteria mV n mCOS <br /> 205 CFR 112.3,1126 Failure to prepare SPCC Plan that meets all applicable requirements in V in R in COS <br /> 206 CFR 112.3(4)(1) Failure d owner to assure that the PE makes all required attestations In the Plan n .R .COS <br /> Amendment of SPCC Plan by Owners m operators away <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary .V .R .COS <br /> 302 CFR 112.5(b) Failed to revew Plan once eery Me years andlor implement my maker,amendments in p oCOS <br /> 303 CFR 112.5(c) Failed to have a PE certify technical amendments o V o R o COS <br /> 304 CFR 112.5(.),112.5(b) Failureto Implement SPCC plan amendments wdhln 6 months .V .R .COS <br /> Qualified Facility-Tier I <br /> 401 CFR 112.6(a),112.6(b) Tier I Qualified Facility Plan not certified by the owner or a PE <br /> 402 CFR 112.6(.H2) Owner&Tier l Qualified Facilltyfaile4 to selfcertify technical amendment .V .R .COS <br /> 003 CFR 112.6(aN3Ni) Plan failed to Predict d'reactioNate of ficwhoay.q of be potermy dischared oV eR oCOS <br /> FMMUW PROW20 S0301 01d620ID <br /> EHD28U1 R—Gr2stral Pagel of Abaveg d Ptlrtlam Storage AC OIR <br /> 1868 E. Hazelton Avenue I Stockton,California 95205 1 T 209 468-3420 1 F 209 464-0138 1 w .sjoehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.