Laserfiche WebLink
April 20, 1995 <br /> Project 113-26-04, Work Plan,Page 9 <br /> TASK 7- PREPARE REPORT <br /> Following completion of the field work and receipt of analytical data, a summary <br /> report documenting the field work, presenting analytical data and outlining the <br /> findings, conclusions and remediation alternatives will be submitted by the client to <br /> the appropriate agencies under the seal of the supervisory State Registered Certified <br /> Engineering Geologist <br /> ESTIMATED SCHEDULE <br /> Task Day§ to Perform <br /> 1- Obtain Approval for Work Plan and Safety Plan 15 <br /> 2- Obtain Permits, Drill Soil Borings, Install Wells 15 <br /> 3- Monitor Well Development, Aquifer Test 5 <br /> 4- Purging and Sampling 5 <br /> 5- Laboratory Analyses 5 <br /> 6- Survey Wells, Analyze Data 5 <br /> 7-Pre are Re ort 10 <br /> Please call us at (510) 439-1024 if you have any questions or comments. <br /> Sincerely; <br />• PARKER ENVIRONMENTAL SERVICES <br /> James D Parker, R E.A #1059 <br /> President <br /> Attachments <br /> C� D GF��o� <br /> GARY D LOWE �N�t <br /> NO` 1FIE CERTIFIED <br /> reviewed by # ENGINEERING <br /> GEOLOGIST <br /> Gary D. Lowe,R.G., C.E.G s� <br /> Principal, Hydrogeologist 9�CFCAL�� <br /> H2OGEOL, A GroundWater Consultancy <br /> cc San Joaquin County PHS, Environmental Health Division <br /> Parker Environmental Services, 190 East 7th Street, Pittsburg, CA 94565-2317 <br /> Phone (415) 439-1024 Fax (415) 439-2566 <br />