My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002384
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
ARCHIVED REPORTS_XR0002384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 3:34:02 PM
Creation date
1/23/2020 3:01:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002384
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t � <br /> TjN <br /> OPERATIONAL DEFINITION AWS', 2 4 <br /> CONSTANT RATE AQUIFER TESTS, Page 2 <br /> ENVIRONMENTAL H,rr'TH <br /> PERM i ISEwicEs <br /> behaviors , considerable interpretational skills are required as well as <br /> faith that the limiting assumptions are suitably valid. <br /> After aquifer test data have been analyzed and evaluated it is possible <br /> to predict the drawdown that would have resulted from a longer period of <br /> pumping or from a higher pumping rate. It is also possible to predict <br /> the drawdown at any given distance from the well , and therefore the <br /> interference of the tested well with other wells, or conversely the <br /> interference of other wells with the tested well . <br /> The design, implementation, and interpretation of aquifer tests must be <br /> undertaken on a case by case basis . The goals to be fulfilled by aquifer <br /> testing in large part controls these activities. <br /> �5'GGEC�� A GROUNDy ,,TE;4 CONSULTANCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.