Laserfiche WebLink
ALT & WITZIG ENGI, ZERING, INC. <br /> 1 Project Name n r Project No. N 0 2 2 Q <br /> i 4 Site Edaerton Ohio <br /> 1 Boring B-4 ( P) Surface Elevation Driller Sr'. <br /> 1 Date Started 5/23 /90 Groundwater Level <br /> Date Completed 5/23/90 ft. on completion <br /> Weather S nn„ - titarm ft, at hrs. <br /> € Boring Method 31-- Hallos: stem ;,uacr ft. at 24 hrs. <br /> 4 <br /> � <br /> Depth Blow Count Recov Description fr Sampl <br /> 5 _ Remarks <br /> 0-1" STONE HNU Readings <br /> ISS 36-33-24-20 40 2 .0 <br /> i <br /> 2SS 13-11-12-13 50 5.0 <br /> i <br /> Gray S Brown Silty CLAY (Fill ) 5 <br /> 3SS 6--4-4-9 0 2 Attempts no <br /> Recovery <br /> # 7 .6 4SS 10-6-9-7 60 15 <br /> 10 SSS 6-7-10-11 90 120 <br /> Brown Silty SAND (Fill) <br /> ��rrrr 6SS 4-4-5-8 100 275 <br /> 7SS 6-8-17-24 95 300 <br /> 5 <br /> ) <br /> 85S 15-3.4-16-25 300 200 <br /> Coarse Wet SAND 17.0 i <br /> 9SS 7-B-11-16 100 18 <br /> ' Stiff Sandy CLAY <br /> 20 LOSS 9 <br /> i <br /> 4 7-11-16-20 11 <br /> + � <br /> SAND b Gravel 23 5 <br /> 12SS 33-38-50 5.0 <br /> � <br /> 25 <br /> 13SS 51 10 <br /> Boring terminated at 26.0 feet. <br /> Page 51 <br /> )I <br /> 88 lop- <br />