My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0002394
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
15
>
3500 - Local Oversight Program
>
PR0545195
>
ARCHIVED REPORTS_XR0002394
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 3:31:53 PM
Creation date
1/23/2020 3:10:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002394
RECORD_ID
PR0545195
PE
3528
FACILITY_ID
FA0002915
FACILITY_NAME
TRACY MARKET INC
STREET_NUMBER
15
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21435004
CURRENT_STATUS
02
SITE_LOCATION
15 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> PHASE SCHEDULE � <br /> I• Approval of Remedial Work Plan by San Joaquin County Public Health Services <br /> Environmental Health Division. <br /> Ii. Week 1 : Drilling and Application of Product <br /> 1 A. Natural water process used to initialize and grow H-10 on the <br /> site for a "Batch Solution". <br /> j B. Install infiltration wells drilled into the contaminate plume. <br /> L 1 <br /> C. "Batch Solution" is then placed into the contaminate plume. <br /> f, D. Monitoring wells are bored in and around the contaminate plume <br /> be used for readings using a photoionization detector (PID), to <br /> E. All borings are placed in a membrane and pile remediated and then <br /> covered by plastic tarp. } <br /> lYi. Weeks 2-4: Monitoring and Reporting: j <br /> x <br /> A. PID readings are taken from the monitoring wells on a weekly <br /> basis. <br /> IV. Weeks 4-Completion (Estimate of 20-40 weeks) k <br /> i <br /> A. PID readings are taken from monitoring wells bi-weekly. i <br /> +� It is estimated that this will take 20-40 weeks to complete. i <br /> Because this is a natural process, each site is different. <br /> Contractor will continue to treat until project is complete. <br /> B. Quarterly status reports will be submitted to San Joaquin County <br /> Public Health Services Environmental Division. <br /> V. Weeks 14-30: Final Testing <br /> { A. When PID readings are below required "clean-up" levels, final <br /> L testing begins. <br /> B. Soil and/or water samples are taken from the site and sent for <br /> formai analysis by a certified independent laboratory. <br /> C. If these levels confirm that the site is below "clean-up" levels j <br /> and is thus "non-actionable", the project is then completed. , <br /> } <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.