Laserfiche WebLink
s x <br /> CHRONOLOGY <br /> STEVE'S RENTAL 1 PESTANA QT1P TRUST <br /> 275 E. GRANTLINE ROAD, TRACY <br /> LOP GROUNDWATER SITE: 35.26 SITE CODE: 2435 <br /> 12/06/89 One underground steel, 550 gallon Waste oil tank removed today under <br /> permit and witness of PHS-EHD's Bill Snavely,(BS) Unit 111. <br /> 04/06/90 BS reviews removal papers and files UAR #90-U39, Prop 65 #90-087 for <br /> soil contamination discovered during removal. <br /> 04/27/90 Diane Hinson, LOP Supervisor mails Backlog Pilot letter to RP. <br /> 05124/90 Site prepares to enter LOP under Steven Schneider (SS) as case <br /> manager. SS reviews proposal to over-excavate soil at tank area. <br /> 01/08/91 SS sends comment letter on recent"Soil Excavation and Sampling <br /> Report" submitted by TECC-Consulting. <br /> 02/05191 Joseph Mell, Attorney for RP sends reply to SS letter of 118/91..Letter <br /> clarifies report and refers to 220 cubic yards of oil and grease <br /> contaminated soils transported to GSX in Buttonwillow CA by Baurle <br /> Trucking. Also 5000 gallons of pit water pumped on July 12, 1990 was <br /> transported by H & H to China Basin road, San Francisco. All over- <br /> excavation done without PHS-EHD notice or oversight TECC <br /> claimed "a mix-up on notifying PHSIEHD". Manifest for soil submitted to <br /> PHS-EHD, but no signatures at "Facility" receiving waste. <br /> 05/28/91 SS approves revised workplan to install monitoring wells at site. <br /> 06/24/91 Three (MW-1, 2, and 3) installed today. <br /> 02/03/92 SS reviews report of monitoring well installation finally received 1122192. <br /> Report is incomplete and missing data, tables, and appendices. <br /> 04/28/92 SS reviews newly re-submitted and complete Phase 11 Environmental <br /> Assessment proposing further over-excavation as additional option. <br /> 07120/92 SS changes site to groundwater contamination on database. <br /> 01/06/93 Mary Meays (MM) assigned to site as SS leaves employment with PHS- <br /> EHD. <br />