My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
275
>
3500 - Local Oversight Program
>
PR0545196
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 3:50:20 PM
Creation date
1/23/2020 3:21:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545196
PE
3528
FACILITY_ID
FA0005840
FACILITY_NAME
STEVE RENTELS
STREET_NUMBER
275
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
275 E GRANT LINE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y .L <br /> 275 E. Grantline Rd., Tracy page 4 <br /> Chronology <br /> 08/05/95 Dave Ruchardt, Ground Zero Consulting calls for advise on completing a <br /> PAR. <br /> 11/28/95 Greg Stahl, Ground Zero, calls to discuss site. Greg questions validity of <br /> some of the previous soil results and tries to get MI to pre-approve hand- <br /> auger proposal over the phone so verification sampling can be performed. <br /> MI denies, but will review workplan when he submits. <br /> 04/29/96 MI generates directive letter and requires site to return to quarterly <br /> monitor since none received since 2n° Quarter-1995. MI warns of non- <br /> compliance and how reimbursement from SWRCB Cleanup Fund may be <br /> in jeopardy. <br /> 06/26/96 As end of 2' Quarter-1996 approaches, John Lane, Ground Zero, calls <br /> for information on what happens if they miss sampling by Friday 6/28. MI <br /> explains site is non-compliant now and continuing to stay non-compliant <br /> could be interpreted by Cleanup Fund as reason to disqualify. <br /> 06/27/96 Groundwater sampled today in confusion. Ml not present since <br /> appointment made for 6/28. <br /> 08/01/96 MI generates comment letter in response to quarterly report for June-1996 <br /> sampling event. MI requires MTBE and two consecutive sampling events <br /> to confirm data. Closure discussed and TRC involvement also. <br /> 11/06/96 MI reviews groundwater report for 3' Quarter-1996 event. No hits in <br /> water for TPH-G, BTEX, or MTBE. MI calls John Lane, and discusses <br /> Closure Report and John to submit in May 1997. MI requires QMRs or <br /> request to modify quarterly sampling. <br /> 12/30/96 MI and John Lane discuss site and closure again. MI will require Closure <br /> Report per CVRWQCB/Tri-Regional Appendix B guidelines., QMR for 1" <br /> Quarter-1997, and options?. <br /> 03/11/97 John Lane contacts MI with "option" per 12/30/96 discussion. John wants <br /> to hand-auger onto next parcel to west to settle neighbors concerns about <br /> possible petroleum impact. MI questions need since trenching indicated <br /> ND to west and NW. MI recommends they re-exam soil data from <br /> previous investigations and verify soil contamination limits prior to <br /> submitting any proposal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.