My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
275
>
3500 - Local Oversight Program
>
PR0545196
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2020 3:42:49 PM
Creation date
1/23/2020 3:23:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545196
PE
3528
FACILITY_ID
FA0005840
FACILITY_NAME
STEVE RENTELS
STREET_NUMBER
275
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
275 E GRANT LINE RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> degraders of long-chain hydrocarbons such as lubricating <br /> oil . The microorganisms present in both the contaminated <br /> soil and the mushroom compost should thoroughly degrade the <br /> TOG contaminants to form the non-toxic end products of <br /> carbon dioxide, minerals, and water within 4 to 8 weeks . <br /> Atmospheric oxygen will be supplied to the hydrocarbon- <br /> utilizing microorganisms in the treatment bed by piping <br /> placed within the bed�and through which air will be drawn <br /> using a vacuum pump. !.Soil moisture will be maintained by <br /> sprinkling the treatment bed with water pumped from the <br /> on-site well purge-water storage tanks after this water has <br /> itself been itself biologically detoxified (this would be <br /> accomplished by adding nutrients and pumping air into the <br /> storage tanks) ? <br /> During the course of the project , the treatment beds will <br /> be monitored for rates of degradation, moisture content , <br /> soil chemistry, and biological activity. Confirmation of <br /> the success of the treatment process will be through the fiJX ` <br /> collection and certified laboratory analysis of one <br /> discrete soil sample for every 20 cubic yards of soil <br /> treated. Each of the two discrete soil samples (one per <br /> every 20 cubic yards of contaminated soil ) will be acquired <br /> by driving a 1 . 9 inch diameter by 6.0 inch long clean brass <br /> tube into the soil until each tube is completely filled <br /> with consolidated material . Upon being withdrawn from the <br /> soil , the ends of each tube will be covered with teflon <br /> sheeting or aluminum foil , fitted with plastic caps , and <br /> sealed with duct tape. Each tube will then marked and <br /> placed within an iced, insulated container for trans- <br /> portation to Priority Environmental Labs under chain of <br /> custody. Certified analysis will subsequently be performed <br /> for Total Petroleum Hydrocarbons as Diesel (TPH-D) using <br /> EPA Methods 3550/8015, Total Petroleum Hydrocarbons as <br /> Gasoline (TPH-G) , benzene, toluene, ethylbenzene, and total <br /> xylenes (BTEX) using EPA Methods 5030/8015-8020, and Total <br /> Oil and Grease (TOG) using 5M 5520 D&F. <br /> The East Street site will remain fenced and the soil under <br /> remediation will be kept partially covered and sufficiently <br /> moist to preclude dust blowing into the shopping center <br /> located adjacent to the treatment area. <br /> As our goal is to reduce the levels of contamination to <br /> below laboratory detection limits , EPM requests permission <br /> to use the remediated soil as clean fill at 2360 East <br /> Street . <br /> Work will begin within two weeks of EPM's receipt of your <br /> authorization to proceed. All work will be performed under <br /> the direction of a Registered Civil Engineer in accordance <br /> W61 D0\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.