_ Services--Environmental Health Dtvision (SJCPHS-EHD) in TECC's <br /> proposal dated March 15, 1990. This excavation was performed on <br /> July 11, 12, and 13, 1990. TFCC performed a further excavation of <br /> the waste oil tank area. The report of findings is included in the <br /> attached Appendix A. The area was excavated to the saturated zone <br /> of the water table - approximately 10.5 feet below surface grade. <br /> Analytical results from soil samples collected immediately aboveC- <br /> s- <br /> the saturated zone indicated concentrations below detection limits; <br /> Purgeable Halocarbons were not tested because none were detected in <br /> the soil samples collected from the base of the UST. Analysis for \ <br /> TPH(g) inadvertently was not tested for in the soil samples <br /> collected from the saturated zone. A sample of the pit water was <br /> collected and analyzed for TPH(g)/BTEX, EPA Method 5030-8015/602, T <br /> Purgeable Halocarbons, EPA Method 601, and Oil and Grease, Standard 71 ` <br /> Method 503 D & E. Results indicated concentrations of 1.8 ppm <br /> TPH(g), 7.5 ppb STEX, 4.2 ppb (1,2-Dichloroethane) and 2.B ppm Oil <br /> and Grease. Recommendation to install four soil borings and three <br /> monitoring wells on the site was included in the Auqust 14, 1990 <br /> TECO report (Appendix A) . <br /> SITE STATUS <br /> The monitor well installations for the Phase II soil and <br /> groundwater contamination assessment (Remedial Investigation) is <br /> presently planned for this site upon approval by SJCPHS-EHD to <br /> proceed with this remedial investigation. <br /> SCOPE OF WORK <br /> During this phase of the investigation and assessment process TECC <br /> intends to: <br /> 1. Install four groundwater monitoring wells in the approximate <br /> locations shown in Figure 3. One, 4-inch well will be <br /> installed in the previously excavated area. Three, 2-inch <br /> diameter wells will be installed on the property in appropriate <br /> locations that will aid in the determination of the groundwater <br /> gradient, establish background levels and also help assess <br /> possible hydrocarbon contamination in the old gasoline UST tank <br /> pit, located to the east of the former waste oil tank pit. <br /> The wells will be installed to an approximate depth of 20 feet, <br /> or to a sufficient depth to penetrate at least 15 feet below <br /> the saturated zone. Should a clay layer, that appears to be a <br /> potential aquitard, be encountered at a depth of less than 15 <br /> feet through the saturated zone, the well will be completed <br /> above this layer. These wells will be installed according to <br /> the attached Drilling, Sealing and Sampling Protocol. <br /> 2. Install four soil boring in the approximate locations shown in <br /> figure 3. The borings will be installed to a depth directly <br /> H:\"PS\WP51\TOM\275GRN"A& WRKPLN PAGE 3 OF 5 <br />