Laserfiche WebLink
rr .r <br /> I <br /> F <br /> 12. The installation of the wells and soil borings will be overseen <br /> by a registered professional Engineer or Geologist. <br /> 13. After review of this phase of the project, a remedial action <br /> plan will forthcoming. <br /> I would appreciate your opinion and any suggested additions or <br /> deletions to the work plan. It is the intent of this work plan to <br /> strongly follow the guidelines for subsurface soil and groundwater <br /> investigations involving LUSTS as set forth by the Tri-Regional <br /> Recommendations of the Central Valley Regional Water Quality <br /> Control Board as outlined in their July 1, 1998 (revised April 3, <br /> 1989) publication. Should you have any questions please call me at <br /> (408) 997 1505. TECC looks forward to working on this and many <br /> other environmental projects in the San Joaquin County area. <br /> 1 <br /> { <br /> i <br /> Sincerely, <br /> Thomas A. Smith <br /> Hydrogeologist/S.A.R.A. Director <br /> E <br /> Attachments: Figure 1-Regional Site Map <br /> Figure 2- 7.5 Min. USGS Topographic Map-Union Island <br /> j Quadrangle <br /> Figure 3 Monitor Well Location Map <br /> Appendix A- Previous Reports <br /> I Drilling, Sealing and Sampling Protocol <br /> ! Health and Safety Plan <br /> i . <br /> H:\APPS\WP51\TOM\275GRNTLN WRRPLN PAGE 5 OF 5 <br /> 't <br />