Laserfiche WebLink
- <br /> d_ <br /> 3 <br /> GROUND-HATER AAHPLING IHPORMATION SRZBT <br /> WELL Hos . <br /> SITE: JOB MWER: <br /> COLLECTOR: DATE SAMPLED: <br /> DEPTH TO NATER PRIOR TO PURGING: Et. <br /> DEPTH TO BOTTOM OP WELL: Eta <br /> STANDING W111 VOLUMIs gallons <br /> PURGE METHOD (C:)eck One) START PURGE: o'clock <br /> Submersible Pump (ISCO or other) END PURGE: o'clock <br /> Bailer PURGE DURATION: minutes <br /> Other (specify) PURGE RATE. gpm <br /> pH Meter Calibration: WELL VOLUMES PURGED: <br /> Conductivity Meter Calibration.: <br /> Temp Conductivity <br /> Time ('c} P—H (Umhos) <br /> SAMPLES COLLECTED: <br /> Sampo. Type Time Remarks <br /> DECON PROCEDURE: (internal) <br /> (external) <br /> FIGURE 8 <br />