Laserfiche WebLink
SECTION 1 <br /> -1 INTRODUCTION <br /> PURPOSE AND POI-IC*Z <br /> is to establish personnel <br /> Procedures <br /> Tle purpose of this safety plsafety practices and P- <br /> ted for the boring and monitor well <br /> plan assigns <br /> atiOl <br /> protection standards and mandatory California. <br /> for all work conduc Tracy, procedures and <br /> project at 275 Gr establishtline nesdlstandard operatingo orations are <br /> respon-ibilitY,contingencies <br /> that may arise while P <br /> provides for conting • <br /> being Conducted at UST sites• for all fiald, on-site <br /> } will abide by this plan. Any <br /> conform to <br /> The provisions of the plan are mandatory <br /> All AES perscn.ne_ at least <br /> personnels used by subcontractors shall <br /> oa ect activities must be <br /> supplement plans requirements* <br /> this plan. All personnel who engage in p <br /> f <br /> his iar with this plan and comply with its req <br /> SITE DESCRIPTION AND <br /> HISTORY <br /> used as a retail <br /> a video rental stone locatedpreviously in <br /> Grantliin 197ne x• <br /> The site is The site was P hydrocarbon <br /> Tracy. California. one UST were removed sometime <br /> gasoline service station. <br /> ed by •AES (TFCC) o dwat1989 samples' <br /> Another was removed by roundwater <br /> products were detected in soil and g <br /> SCOPE OF WORK <br /> erformed includes the <br /> insb�ollect�ionf01 <br /> The field tasks to be P analysis <br /> groundwater monitoring wells and 4aboratoryinns and <br /> g les for <br /> soil and groundwater same <br /> PRO TEAM ORGANIZATION be <br /> Manager and TeCrnical CO including locating <br /> The AES Projectall field activities, and ensuring <br /> re9ponsible for directing activities, to pfederal, state and <br /> borings and wells, field logging <br /> that all aces are conducted according operations <br /> local regulations. <br /> Company will conduct their <br /> Technical <br /> The subcontracted drilling the Project Manager <br /> according to the directions of uideline:3• <br /> Borehole and well isq s will be conducted Y <br /> Coordinator- company following regulatory well <br /> the drilling by AES, will Perform <br /> employed responsible for collecting <br /> Field technicians s and will be <br /> development activities <br /> groundwater samples <br /> I '� <br />