Laserfiche WebLink
275 Grantline Rd. <br /> Page 7 of 7 <br /> the Central Valley Regional Water Quality Control Board and the San <br /> Joaquin County Department of Environmental Health. Because the <br /> analytical results are based on data collected at the sampling <br /> locations only, TECO cannot have complete knowledge of the <br /> underlying conditions. Conditions at the project site may change <br /> with time due to the works of man and/or acts of nature. <br /> Accordingly, the findings of this report may be subject to <br /> revisions in light of new data. <br /> THE ENVIRONMENTAL CONSTRUCTION COMPANY is pleased to be of service <br /> to you on this project. If ther- are any questions in regards .to <br /> this report of findings or any other matter please feel free to <br /> call us at (408) 997 1505. <br /> Your Truly, <br /> Thomas A. Smith <br /> Hydr ologist/S.A.- R.A. Coordinator <br /> Ro e t J. Whitman <br /> President <br /> E Attachments: I. Site Location and Sampling Maps <br /> 2 . Analytical Results of Soil and Pit Water Sampling <br />