Laserfiche WebLink
General housekeeping activities previously requested by Ms . <br /> Meays were performed during March, 1994 . The activities <br /> involved the emptying and removal of drums containing well <br /> purge water , the introduction of the purge water into a <br /> storage tank located on other Pest&.na Trust property <br /> located across Grant Line Road at 2350 East Street , Tracy <br /> for biologicai degradation, the emptying of drums <br /> containing drill cuttings onto the on-site soil storage <br /> pile , and the removal of general refuse dumped at the site <br /> by unknown parties . <br /> COMPLIANCE MONITORING OF THE ON-SITE WELLS <br /> Sampling of the three on-site , 2-inch inside-diameter <br /> groundwater monitoring wells (MW-1 , MW-2 , and MW--3 ) was <br /> performed on September 30 , 1994 with the approval of Mr . <br /> Michael Infurna of San Joaquin County PHS/EHD. <br /> Depth to water and total well depth in each of the wells <br /> were measured using an electric tape and the volume of <br /> water within each well casing was computed. Each well was <br /> then purged using a clean , disposable, polyethylene bailer <br /> until the groundwater was free of significant sand, silt , <br /> and/or other grit , and temperature , pH , and electrical <br /> conductivity readings stabilized . In this case, over three <br /> . well volumes of water were removed from each well . <br /> Measurements acquired attendant to sampling appear on the <br /> well monitoring forms enclosed in Appendix A. <br /> Subsequent to the purging of each well , a groundwater <br /> sample was collected in a clean, disposable polyethylene <br /> bailer . Each sample was transferred into a one-liter amber <br /> glass sample bottles and two Volatile Organic Analysis <br /> (VOA) vials . Each sample container was promptly fitted <br /> with a teflon-lined screw cap , labeled, placed. on ice , and <br /> transported under chain of custody to Priority Environ- <br /> mental Lams of Milpitas , a California-state certified <br /> hazardous waste analytical laboratory . Analyses were <br /> subsequently performed for Total Petroleum Hydrocarbons as <br /> Diesel (TPH-D) using EPA Methods 3510/8015 , and Total <br /> Petroleum Hydrocarbons as Gasoline (TPH-G) , benzene , <br /> toluene , ethylbenzene , and total xylenes (STEX) using EPA <br /> Methods 5030/8015-8020 ( 602 ) . The sample acquired from <br /> well MW-1 was also analyzed for Total Chromium using EPA <br /> Method 7190 . <br /> Copies of the results of certified analyses as received <br /> from the certified are enclosed within Appendix A. <br /> These results are summarized and compared with previous <br /> sampling results in the followng table : <br /> Page 7 <br />