Laserfiche WebLink
Table 4, continued <br /> Sample Date <br /> & Depth of TPH-D TPH-G B T E X TOG <br /> Sample (ft) (ppm) (ppm) (ppm) (ppm) <br /> ---------------------------------------------------------- <br /> BT Center/3 ' N.D. N . D. N.D. N.D. N.D. N. D N D. <br /> BT Center/8 ' N D. N . D. N.D. N. D. N.D. N .D. N.D <br /> BT South/8 ' N.D. N .D. N.D. N.D. N.D. N.D. 91 <br /> ---------------------------------------------------------- <br /> Method <br /> Detection 1 0 1 . 0 5 0 5 . 0 5 .0 5 .0 10 <br /> Limit <br /> ---------------------------------------------------------- <br /> Bldg Tr. . .Building Trench <br /> TPH-D. . . Total Petroleum Hydrocarbons as Diesel <br /> TPH-G. . .Total Petroleum Hydrocarbons as Gasoline <br /> BTEX. . .Benzene, toluene, ethylbenzene, total xylenes <br /> TOG. .Total Oil and Grease <br /> ppm. . Parts per million <br /> ppb. . Parts per billion (1 ppm = 1 ,000 ppb) <br /> SUMMARY OF OTHER ENVIRONMENTAL ACTIVITIES PERFORMED DURING <br /> THE PAST QUARTER <br /> The direction of groundwater flow and hydraulic gradient <br /> has been calculated for the February, 1994 sampling event . <br /> Groundwater continues to flow to the northeast . Infor- <br /> mation regarding the methodology used to determine the <br /> direction of flow and hydraulic gradient is presented in <br /> Appendix B. <br /> General housekeeping activities previously requested by Ms . <br /> Meays were performed during March and included the emptying <br /> and removal of drums containing well purge water , the <br /> introducted of the purge waterinto a storage tank for <br /> biological degradation, the emptying of drums containing <br /> drill cuttings onto the on-site soil storage pile, and the <br /> removal of general refuse dumped at the site by unknown <br /> parties <br /> ENVIRONMENTAL COMPLIANCE ACTIVITIES SCHEDULED FOR THE NEXT <br /> QUARTER <br /> EPM will complete the assessment tasks prescribed by <br /> PHS/EHD. The extraction and on-site groundwater treatment <br /> system will also be installed upon issuance of necessary <br /> permits . The next sampling of the on-site wells for <br /> Page 10 <br />