Laserfiche WebLink
CHILLER INSPECTION <br /> — Suction Press Temp In Temp Out <br /> Chiller Liquid Level (5.60 PSI) � — <br /> 56 <br /> 2AB % — <br /> 3AB :5-1 <br /> 4AB <br /> 5AB o° 73 �— <br /> 7 <br /> 8 i� % <br /> y % <br /> 9 <br /> o <br /> 10 7 % 2 1 <br /> 11 % <br /> 12 (O <br /> 13 30 % o 7Z <br /> 3 1 <br /> 14 S1 /° — <br /> ACCUMULATOR/LIQUID SUCTION ACCUM �,LESSURE RECEIVER <br /> TRANSFER CHECKLIST 4C/ <br /> Liquid NH3 Bulls ( � ) <br /> Accumulator N113 Level — <br /> Trans.Pump/Check Oil p� Any Oil Drained Approx. Gal r1.� <br /> f 1 Visual Condition O <br /> Trans er Pum Run Time '1 <br /> Inspections of P.R.V.'s And O <br /> Any Oil Drained Approx. Gal vll10 Values <br /> EMERGENCY AMMONIA DIFFUSION AMMONIA RECIRCULATOR <br /> PANEL PACKAGE <br /> _ Check Cornell Pump for On Off <br /> Visual Inspection of Panel �1(y Proper O eration <br /> Suet: Check Oil Reservoir Indicator 3 3� <br /> (5-60 psi) Z� Rod <br /> Are Gauges in Proper Operation Check Shaft Seals and Any �v <br /> Condition Disc: <br /> (120-205 psi) C �Q Indications of Oil Leaks <br /> Any Indications of Ammonia Leaks m Surge Drum level Bulls (2 ) <br /> Panel <br /> Check Pressure Gauges <br /> Any Oil Drained Approx. <br /> Gal <br />