My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
298
>
3500 - Local Oversight Program
>
PR0545197
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 8:26:10 AM
Creation date
1/24/2020 8:12:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545197
PE
3528
FACILITY_ID
FA0020769
FACILITY_NAME
HAPPY CARS AUTO CARE
STREET_NUMBER
298
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23321019
CURRENT_STATUS
02
SITE_LOCATION
298 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> CLOSURE CHRONOLOGY FOR 298 W. <br /> GRANTLiNE RD., TRACY, CA <br /> W. T. Jordan <br /> i <br /> April 5 1988 Four USTs removed under PHS/EHD permit. Odor <br /> apparent below USTs. <br /> April 19, 1988 Soil and water samples collected beneath USTs evidence <br /> TPHg and BETX contamination. <br /> April 25, 1988 UAR and Prop 65 completed. <br /> September 12, 1988 Cleanup file created. <br /> i <br /> September 14-15, 1988 MWs 1, 2 and 3 were installed (Preliminary Site <br /> Assessment). <br /> November 30, 1988 Preliminary Site Assessment Report was received by <br /> PHS/EHD , soil and groundwater contamination (TPHg and <br /> BTEX) evidenced. <br /> July 5, 1990 RWQCB quarterly review. <br /> March 7, 1994 Contaminated site letter sent to RP from PHS/EHD UST <br /> Unit 3. <br /> September 2, 1994 Site entered LOP. LOP file created 9126194. <br /> October 13, 1994 NOR letter mailed to RP. <br /> February 22, 1995 Boring B 1 and B2 constructed to 10 feet bsg. Odors <br /> observed. <br /> April 17, 1995 Overexcavation observed by PHS/EHD at site. Approx. <br /> 75-108 cu. yds. of contaminated soil removed to Forward <br /> Landfill. Clean fill was replaced in excavated area. <br /> May 25 and June 26, 1995 Further trenching excavation (north, west and south of <br /> previous excavation—6' deep 20' wide) observed by <br /> PHS/EHD. Approx. 125 cu. yds. of contaminated soil were <br /> removed to Forward Landfill. Soil samples collected from <br /> 4 to 8 feet bsg along trench evidenced contamination. <br /> July Quarterly sampling of MWs resumes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.