Laserfiche WebLink
' TABLE OF CONTENTS <br /> 10 INTRODUCTION AND SCOPE OF WORK 1 <br /> 20 BACKGROUND I <br /> 21 SITE DESCRIPTION 1 <br /> 22 UNDERGROUND STORAGE TANK REMOVAL 1 <br /> 23 MONITORING WELL INSTALLATION AND SAMPLING 2 <br /> 24 ADDITIONAL SOIL AND GROUND WATER ASSESSMENT 2 <br /> 25 EXCAVATION AND TRENCHING PROCEDURES 2 <br /> 26 GROUND WATER MONITORING AND SAMPLING 2 <br /> 3 0 PROCEDURES 3 <br /> 31 MONITORING WELL PURGE PROCEDURES 3 <br /> 3 2 COLLECTION OF GROUND WATER SAMPLES 3 <br /> ' <br /> 40 FINDINGS 3 <br /> 41 GROUND WATER ELEVATION AND GRADIENT 3 <br /> 4 2 LABORATORY REPORT OF GROUND WATER MONITORING 4 <br /> ' <br /> 50 CONCLUSIONS N AND RECOMMENDATIONS 4 <br /> 60 LIMITATIONS 4 <br /> LIST OF FIGURES <br /> Figure 1 -Location Map <br /> ' Figure 2 - Site Plan <br /> Figure 3 -Relative Ground Water Elevation (October 1995) <br /> Figure 4 -Final Excavation Plan <br /> LIST OF TABLES <br /> Table 1 - Ground Water Elevations <br /> ' Table 2 - Analytical Results of Ground Water Samples <br /> LIST OF APPENDICES <br /> Appendix A- Ground Water Stabilization Data <br /> Appendix B - Analytical Results Ground Water Samples <br /> '1 <br /> b <br />