Laserfiche WebLink
- - - - -- - - TABLE OF CONTENTS <br /> ' <br /> 10 INTRODUCTION AND SCOPE OF WORK 1 <br /> ' 20 BACKGROUND 1 <br /> 21 SITE DESCRIPTION 1 <br /> 2 2 UNDERGROUND STORAGE TANK REMOVAL 1 <br /> ' 2 3 MONITORING WELL INSTALLATION AND SAMPLING 1 <br /> 30 PROCEDURES 2 <br /> 31 MONITORING WELL PURGE PROCEDURES 2 <br /> 32 COLLECTION OF GROUND WATER SAMPLES 2 <br /> ' <br /> 33 DRILLING AND SAMPLING 2 <br /> 34 LOGGING 3 <br /> 35 EXCAVATION AND TRENCHING PROCEDURES 3 <br /> ' 36 EXCAVATION BACKFILLING 4 <br /> 40 FINDINGS 5 <br /> ' <br /> 41 GROUND WATER ELEVATION AND GRADIENT 5 <br /> 42 LABORATORY REPORT OF GROUND WATER MONITORING 5 <br /> 43 STRATIGRAPHY 5 <br /> 44 FIELD AND LABORATORY RESULTS OF SOIL BORING/GRAB WATER <br /> SAMPLES 5 <br /> 45 ANALYTICAL RESULTS OF TRENCHING, EXCAVATION AND STOCK PILE <br /> ' SAMPLES 6 <br /> 50 CONCLUSIONS AND RECOMMENDATIONS 6 <br /> ' 51 HYDROCARBON-IMPACTED SOIL 6 <br /> 5 2 HYDROCARBON-HVIPACTED GROUND WATER 7 <br /> 60 LIMITATIONS 7 <br /> LIST OF FIGURES <br /> Figure 1 - Location Map <br /> ' Figure 2 - Site Plan <br /> Figure 3 - Excavation and Trenching Plan <br /> Figure 4 - Final Excavation Plan <br /> ' Figure 5 - Ground Water Elevation - February 1995 <br /> Figure 6 - Ground Water Elevation - July 1995 <br />