Laserfiche WebLink
' 06 October 1997 - <br /> AGE-NC Project No 95-0105 <br /> Page 4 of 4 <br /> ' if certified site closure is not achieved by November 1997,AGE recommends that quarterly <br /> monitoring be scheduled for November 1997 <br /> 60 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> ' analytical results provided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> available data points (i e monitoring well ground water samples) and subsurface conditions may <br /> ' vary away from these data points No other warranty, expressed or implied, is made as to the <br /> professional recommendations contained in this report <br /> r <br /> r <br /> r <br /> 1 <br /> 1 <br />