My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
SITE HISTORY_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:18 AM
Creation date
1/24/2020 11:03:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
FileName_PostFix
FILE 2
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> /00 Underground storage tanks were removed and the station was demolished <br /> L�((Ultomo starting this date. Approximately 200 cubic yards of soil was excavated from <br /> beneath the northwest and southeast dispenser islands and product lines. See <br /> Gettler-Ryan's Soil Sampling during Station Demolition Activities dated <br /> August 8, 2000, available on Questy's. <br /> 09/30/01 The soil vapor extraction system was shut down this quarter. The system <br /> removed an estimated 14,794 pounds of total petroleum hydrocarbons as <br /> gasoline and 183 pounds of benzene. <br /> 11/20/01 Ozone infusion points SP's 1-13 were installed beginning this date. See Gettler- <br /> Ryan's Ozone Microsparge Well & System Installation Report dated <br /> February 1, 2002, available on Questy's. <br /> 12/19/01 Remediation of the groundwater contamination by ozone infusion began this <br /> date. See the above referenced Gettler-Ryan report. <br /> 08/12/04 The soil vapor extraction system was restarted for a month; it was determined to <br /> be no longer cost effective to operate. The system was subsequently removed <br /> from the site in January 2005 after EHD approval to do so. <br /> 11/04/09 The ozone sparge system was shut down on this date. <br /> 12/18/09 Stantec Consulting Corporation submitted Results of Hydrogeologic Modeling <br /> report this date. <br /> 03/05/10 Stantec consulting Corporation submitted Quarterly Status Summary Report — <br /> First Quarter 2010 and Request for Low-Risk Case Closure this date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.