My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4707
>
3500 - Local Oversight Program
>
PR0545229
>
WORK PLANS_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2020 11:25:32 AM
Creation date
1/24/2020 11:10:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 1
RECORD_ID
PR0545229
PE
3526
FACILITY_ID
FA0003903
FACILITY_NAME
TOSCO CORPORATION #31258
STREET_NUMBER
4707
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816004
CURRENT_STATUS
02
SITE_LOCATION
4707 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1FROM ' • 1997.10_15 15:49 #561 P.06/06 <br /> Uctnber la_ 1997 <br /> Pz^_e 3 <br /> RECOMM ET DA TI On S <br /> PACIFIC recommends that Tosco prepare a request of case review and closure status <br /> for submittal to the SWRCB Underground Storage Tank Fund manager. This review <br /> request will allow the SWRCB to evaluate the need for additional site assessment and <br /> the appropriateness of granting site closure. The request must include all information <br /> listed in the State's guidance letter for submitting closure reviews dated January 3. 1997. <br /> In addition a completed Underground Storage Tank Cleanup Fund Case Review Form <br /> must be attached along with selected project reports_ PACIFIC is prepared to complete <br /> the required information and forms for submittal to the SWRCB by October 31. 1997. <br /> During the SWRCB's case review, PACIFIC recommends continued quarterly ground- <br /> water monitoring and operation of the site SVE system. <br /> Please call if you have any questions. <br /> Sincerely <br /> Pacific Environmental Group, Inc <br /> Jct � �/ �r�•, <br /> R. Lee Dooley 3 <br /> CEE-:F:_D <br /> SeniorGeologist 11YCt0m <br /> CEG 1006sr EY.P. a/,p <br /> �P <br /> I i �Te a+= CAL1F�0. <br /> Robert K. Wen✓zlau, P.E. <br /> Senior Engineer <br /> RCE 37395 <br /> 3171(A 7.4'JI4j,S70A.DoC <br />
The URL can be used to link to this page
Your browser does not support the video tag.